Loading...
874 W LINCOLN AVEPermit Types BLD I ELE MEC PLM __X__F X X X `1z Permit Number: BLD2020-01059 Issued:07/01/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section. 72 Site Address: 874 W LINCOLN AVE Legal Description: BURKLES SUB LOT 3 FOR OF LOT CITY OF AIEIM i : ' i DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Tenant Improvement: Construct new non -load bearing partitions, remodel accessibilty, counter and install new hood. Valuation: $15,000.00 Construcion Types: VB, Occupancy Groups: Fire Sprinklered? No Total Fees paid for Permit: 2.159.20 People Associated with Project Owner MICHAEL K DASKALAKIS TR 623 N JAMES PLACE ANAHEIM CA 92801-4710 Contractor LY DUONG TANG 1109 E PUENTE AVE WEST COVINA CA 91790 Permit Applicant LY DUONG TANG 1109 E. PUENTE AVE WEST COVINA CA Type Electrical Fixtures Qty Type Plumbing Fixtures City Type Mechanical Fixtures City Receptacle, switches, lights 4 Gas System (1-5 outlets) 1 Commercial Hoods (including ducts) Evaporative Cooler (not portable) The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. I_ PNPHcIM �� City of Anaheim OF io Building Division _ �i OVNpEO `$ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are sed Final Gas Test 5VIehm Electrical Final lluftt �$ Plumbing Final I Inht)$ Mechanical Final / Cross Connection Control (714) 765.4280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned Building Final (714765-5153) Last Inspection -Final Only After Above Completetl 1121'�ti �S/.rvr/ rGt6 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Sta-Z j PAff ulY I SA- A4&a O%, a2friA-d- Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) �r/AA� do /ys�/dA 2,nA1 r 44i (*= iLtL Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections ©'- 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) � * LAMA2 Ot t07"- +1A�� � %,k&= Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out)` Rough Duct (Mechanical) Rough Mechanical Rough Electrical ?r w- Rough COAIMitagation Measures Plumbing Inspections (9)'� 1 iz �� Framing (Only after Plbg., Ele., Mec. & Fire) 21 Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor iDo not hnrld If unless Rjnnpd off) Sewer Water Engineering Backflow (Testable Only) Water Service M1