451 W LINCOLN AVE (2)Permit Types
BLD ELE
MEC
PLM
x
Permit Number: BLD2024-00426
Issued: 01/23/2024
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
www.anaheim.net/building
(714)765-0626
Quarter Section: 72
Site Address: 451 W LINCOLN AVE, Anaheim, CA 92805
Legal Description: P BK 142 PG 11 PAR 1 P M 142-11 PAR 1 AND PAR 2
APN: 25506417
Project Description: Reroof: Remove and install (65) squares of Flat roof cool torch down over commercial building
Living Area: Number of Stories: 0 Velua6on:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Root
Tout Fees paid for Permit:
People Associated with Project:
Contractor AVANT ROOFING CORP 5900 SEPULVEDA BLVD,SUITE # 1044 VAN NUYS, CA
Permit Applicant Robert Gilardi
Owner HARBOR LINCOLN LLC PO BOX 4826
36,000.00
N/A
45108
Type Electrical Fixtures Qty Type Plumbing Fixtures Oty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
C�pk1E1M Cd`
City of Anaheim o4 !�D
Building Division z
U >
�oUNDED tV
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE -
!NSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subli or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work helow until the fallowing applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinfu Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plhg Ele. Mec & Fin,
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable tems have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business Jays after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service