Loading...
423 S PASEO REAL (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-03610 Issued: 07/16/2024 www.anaheim.nettou (ding (714)765-4626 Quarter Section: 198 Site Address: 423 S PASEO REALANAHEIM, CA 92807 Legal Description: N TR 8220 BLK LOT 58 APN: 35601124 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 P NEIM \ > OUNDED `g9 Project Description: Reroof: Remove and install (1617) sq of composition shingles for the peaks of the house and (1483) sq of flat roof in the front and rear of the property Living Area: Garage Area: Carport Area: Balcony / Deck Area: Cool Roof: People Associated with Project Number of Stones: Permit Applicant Joseph De Luca Owner DE LUCA, JOSEPH PATRICK S 8 KELLI ANNET 423 S PASEO REAL 1 Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Pennh: 12,400.00 NIA 374.61 Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PNrt{EIM off` Cityof Ana h e i m OF io Building Division ti y > • �OVNDED tsq^ Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lie. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765.6153) Last Inspection -Final Only After Above Completed Plumbing(GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Insf 2ctiolns ` R� I0 Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab(CompactionlMembrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been siQned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragmlFrame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mae & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mae.) Grease Interceptor (Do not bankfill unless sinned offi Sewer Water Engineering Backflow (Testable Only) Water Service