Permit Number: BLD2023-05059
r
Issued: 01/26/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 32
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765 - 5153
Site Address: 105 N BROOKHURST ST, Anaheim, CA 92801
Legal Description: S TWP 4 RGE 10 SEC 7 T4S R10W SEC 7 FOR OF SE114 -
APN:07118155
Project Description: Change of Use: 975 sq. ft. for build out of shell unit into a bakery (A-2) with
associated mechanical, electrical, and
plumbing (Filo Dessert).
Living Area: Number of stones:
1 Valuation:
60,000.00
Garage Area:
Construction Types:
Val
Carport Area:
Occupancy Groups:
A2
Balcony I Deck Area:
Fire Sprinklered:
Yes
Cool Roof:
Total Fe. paid for Permit:
4,577.89
People Associated with Project:
Permit Applicant ABDULKARIM FATEH
Owner KASSABIAN, ANTRANIK G TR 17950 LAKE VISTA DR
Contractor AKF CONSTRUCTION INC 151 N TUSTIN AVE UNIT
#B3 TUSTIN, CA 92780
Engineer - Mechanical MOTAZ W OUDAH 2480 IRVINE BLVD TUSTIN,
CA 92782
Type Electrical Fixtures Oty Type Plumbing Fixtures
Oty Mechanical Fixtures
Oty
Receptacle, switches, lights 57 Floor Drain
1 Commercial Hoods (including ducts)
1
Sub Panel/Temp Pwr - Under 600 V. up to 1 Floor Sink
2 Commercial System per 1,000 sq. ft.
1
200 amps
Kitchen Sink
2
Lavatory
3
Service, Mop, Slop Sink
1
Water Closet
1
Water Heater
1
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�I,HEIM c�(
Cityof Anaheim o4 1O
Building DIVI510n F Z
>
• FD`NDEo ve`'^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
;our concrete until the following applicable items have been signed:
Fire Dept. Final (714) 7655041
Plumbing (Ground/Underfloor Drain Waste)
,53
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfioor or co_ - ntil the follwin i ble items have been
- n
Building Final (75153)
Last Inspection-FinalOnly Only Aker Above Completed
'''`l
f��
—Y'
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (CompactionlMembrane Reinf.) o—
—Z.
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do aork below until the
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphragmlFrame)
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out) _
P-/i1-
Rough Duct (Mechanical)
Rough Mechanical S
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele_ Mac. & Fire)
`L
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter mll be set within 2 3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mac.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service