Loading...
105 N BROOKHURST ST (4)Permit Types BLD ELE I MEC PLM X X . X X Permit Number: BLD2023-05059 r Issued: 01/26/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 32 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765 - 5153 Site Address: 105 N BROOKHURST ST, Anaheim, CA 92801 Legal Description: S TWP 4 RGE 10 SEC 7 T4S R10W SEC 7 FOR OF SE114 - APN:07118155 Project Description: Change of Use: 975 sq. ft. for build out of shell unit into a bakery (A-2) with associated mechanical, electrical, and plumbing (Filo Dessert). Living Area: Number of stones: 1 Valuation: 60,000.00 Garage Area: Construction Types: Val Carport Area: Occupancy Groups: A2 Balcony I Deck Area: Fire Sprinklered: Yes Cool Roof: Total Fe. paid for Permit: 4,577.89 People Associated with Project: Permit Applicant ABDULKARIM FATEH Owner KASSABIAN, ANTRANIK G TR 17950 LAKE VISTA DR Contractor AKF CONSTRUCTION INC 151 N TUSTIN AVE UNIT #B3 TUSTIN, CA 92780 Engineer - Mechanical MOTAZ W OUDAH 2480 IRVINE BLVD TUSTIN, CA 92782 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty Receptacle, switches, lights 57 Floor Drain 1 Commercial Hoods (including ducts) 1 Sub Panel/Temp Pwr - Under 600 V. up to 1 Floor Sink 2 Commercial System per 1,000 sq. ft. 1 200 amps Kitchen Sink 2 Lavatory 3 Service, Mop, Slop Sink 1 Water Closet 1 Water Heater 1 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�I,HEIM c�( Cityof Anaheim o4 1O Building DIVI510n F Z > • FD`NDEo ve`'^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable Items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 ;our concrete until the following applicable items have been signed: Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) ,53 Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfioor or co_ - ntil the follwin i ble items have been - n Building Final (75153) Last Inspection-FinalOnly Only Aker Above Completed '''`l f�� —Y' Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reinf.) o— —Z. Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do aork below until the 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragmlFrame) Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) _ P-/i1- Rough Duct (Mechanical) Rough Mechanical S Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele_ Mac. & Fire) `L Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter mll be set within 2 3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mac.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service