Loading...
807 S CANYON MIST LN (5)Permit Types BLD ELE MEC PLM X X X Permit Number: BLD2023-05829 Issued: 12/29/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 208 CITY OF ANAHEIM Site Address: 807 S CANYON MIST LN, ANAHEIM, CA 92808 Legal Description: N TR 12689 BLK LOT 9 APN: 35651145 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Remodel: 325 sq. ft. to construct detached aluminum Patio Cover in the backyard with plumbing and electrical for new BBQ and fire pit. Living Area: Number of Stories: 2 Valuation: Garage Area: Construchan Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Coal Roof: Total Fees paid for permit: 6,000.00 VB 1.131.71 People Associated with Project: Owner STODDARD, SABRINA O 807 S CANYON MIST LN Contractor TECH LA BUILDER 136 LOST HILLS IRVINE, CA Engineer - Civil SHU WU 530 TECHNOLOGY DR IRVINE, AZ 92618 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Conduit and Conductors - per 50 ft. 2 Gas System (outlets) 1 Receptacle, switches, lights 5 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�pHgIM �d` City of Anaheim DF iO Building Division ti y U > OVNDED tsq^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final (�-�.vyt,1 Plumbing Final �3 Mechanical Final Cross Connection Control (714) 765-4260 Engineering Final (714) 765-6126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormslTrenches (Footings) -lit COA/Migation Measures Do not insall subfloor or pour Floor slab until the foliwing applicable items have been s dried Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas !C ]fj Qz PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) I Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stoned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease interceptor Sewer Water Engineering Backflow (Testable Only) Water Service