Permit Number: BLD2022-05572
Issued: 01/08/2024
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
47141765 - 5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 63
Site Address: 500 S ILLINOIS ST B, Anaheim, CA 92805
Legal Description: N TR 335 BILK B LOT 1 TR 335 LOT 1 BLK B N 48.16 FT
APN: 03613231
n.?\may ;z i
.r
+I�♦ Vic. j .
Project Description: (ADU) Residential Addition: 894 sq. ft. to convert existing detached garage into accessory dwelling unit. Install
200amp dual -meter panel. Work done prior to obtaining a permit. (2bd/2bth) REF: INV2022-00359, BLD2022-05570
Living Area:
Garage Area:
Carport Area:
Balcony I Deck Area:
Cool Roof:
People Associated with
Owner
Engineer - Civil
8" Number of Stories:
Afroz Lokhandwala
SOUTHLAND REALTY LLC
WAQAS A KHAN
1 Valuation:
Construction Types:
Occupancy Groups:
Fire Spdnklered:
Total Fee. paid for Permit:
500 S ILLINOIS ST
2095 E BALL RO ANAHEIM, CA 92806
100,000.00
VB
No
4,154.56
Type Electrical Fixtures City Type Plumbing Fixtures Oily Mechanical Fixtures Oty
Meter/Disc Sw - Under 600 V, up to 200 2 Bath Tub 2 Mini Split (room unit) 2
amps Garbage Disposal 1 Ventilation Fan - <= 300 cfm on single duct 3
New or total rewire -1 or 2 family 894
Sub Panel/Temp Pwr- Under 600 V, up to 1 Kitchen Sink
200 amps Lavatory
Sewer per 100 ft.
Washing Machine Rough
Water Closet
Water Distribution
Water Heater
Water Main per 100 ft.
1
2
1
1
2
1
1
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PN PHEIM C9`
Cityof Anaheim O� iO
Building Division F Z
>
' ND ED tb`'1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4260
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
/
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mac.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service