401 N VINE ST (3)Permit Types
BLD ELE MEC FILM
X
Permit Number: BLD2023-06211
Issued: 12/14/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 82
Site Address: 401 N VINE ST, ANAHEIM, CA 92805
Legal Description: N TR 2723 BLK LOT 6
APN: 03522106
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 •5153
Project Description: Seismic Upgrade: Voluntary seismic retrofit URFP bracing on raised foundation
Living Area: Number of Stones: 0 Valuation:
Garage Area: Construction Types:
Capon Area: Occupancy Groups:
Balcony I Deck Area Fire Spdnklered:
Cool Roof: Total Fees paid for Permit:
People Associated with Project
Permit Applicant Catherine Janowicz
Owner FRANKS-JANOWICZ, CATHERINE TR THE S P 1636 SALMON RIV
5,500.00
VB
771.82
Type. Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures 019
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
b�PHEIM c�C
City of Anaheim D4 i0
Building Division ? i
>
�0UNDEC) tb`'^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable Items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
(2
il-i
COA/Migation Measures
Dn not r stall subfloor or pour floor slab until the follwing appli a.le dews have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
1214
I�
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work bF1 i ilil 111,r Irwrnn aupii"a hie hell rs .rave
rd
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after Plbg Eie Uec S F,ret
Insulation (Sound/Energy)
Do not rape of plaster until the rellovvino apphcabre item_ have been sryned
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
FM r,
Sewer
Water Engineering Backflow (Testable Only)
Water Service