Loading...
401 N VINE ST (3)Permit Types BLD ELE MEC FILM X Permit Number: BLD2023-06211 Issued: 12/14/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 82 Site Address: 401 N VINE ST, ANAHEIM, CA 92805 Legal Description: N TR 2723 BLK LOT 6 APN: 03522106 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 •5153 Project Description: Seismic Upgrade: Voluntary seismic retrofit URFP bracing on raised foundation Living Area: Number of Stones: 0 Valuation: Garage Area: Construction Types: Capon Area: Occupancy Groups: Balcony I Deck Area Fire Spdnklered: Cool Roof: Total Fees paid for Permit: People Associated with Project Permit Applicant Catherine Janowicz Owner FRANKS-JANOWICZ, CATHERINE TR THE S P 1636 SALMON RIV 5,500.00 VB 771.82 Type. Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures 019 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. b�PHEIM c�C City of Anaheim D4 i0 Building Division ? i > �0UNDEC) tb`'^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable Items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) (2 il-i COA/Migation Measures Dn not r stall subfloor or pour floor slab until the follwing appli a.le dews have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed 1214 I� Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work bF1 i ilil 111,r Irwrnn aupii"a hie hell rs .rave rd list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Plbg Eie Uec S F,ret Insulation (Sound/Energy) Do not rape of plaster until the rellovvino apphcabre item_ have been sryned Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor FM r, Sewer Water Engineering Backflow (Testable Only) Water Service