Loading...
872 S ASPEN ST (6)Permit Types BLD ELE ME C PLM X Permit Number: BLD2022-00773 Issued: 03/16/2022 www.anaheim.nef/building (714)765-4626 Quarter Section: 74 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 872 S ASPEN ST, ANAHEIM, CA 92802 Legal Description: N TR 1949 BLK LOT 21 APN: 03638115 Project Description: Reroof: Remove existing material, resheath as needed and install 10 square of shingles on house and attached garage. Living Area. Number of Stories: 0 Valuai 17,225.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony r Deck Area. Fire Spnnklered: Cool Roof. Total Foes paid for pariah: 341.24 People Associated with Project: Contractor PENGUIN HOME SOLUTIONS INC 21860 VAN BUREN BLVD STE 101 RIVERSIDE, CA 92506 Permit Applicant Jeffrey Hernandez Owner ARBUSO JOSEPH J & EVA M 872 S ASPEN ST Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. NPHEIM Cq\\ Cityof Anaheim Op (��o Building Division i v > SOUNDED b Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test PFRUILKERED Electrical Final - Plumbing Final „ ,•„ , , Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-512 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Llc. (714) 765-5194 (Allow 10 business days) SetbacklForms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stained 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (SoundlEnergy) Do not tape or piaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not hackf It unless q nned off) Sewer Water Engineering Backflow (Testable Only) Water Service