872 S ASPEN ST (6)Permit Types
BLD ELE ME
C PLM
X
Permit Number: BLD2022-00773
Issued: 03/16/2022
www.anaheim.nef/building
(714)765-4626
Quarter Section: 74
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 872 S ASPEN ST, ANAHEIM, CA 92802
Legal Description: N TR 1949 BLK LOT 21
APN: 03638115
Project Description: Reroof: Remove existing material, resheath as
needed and install 10 square of shingles on house and attached
garage.
Living Area. Number of Stories:
0 Valuai 17,225.00
Garage Area:
Construction Types: NIA
Carport Area:
Occupancy Groups:
Balcony r Deck Area.
Fire Spnnklered:
Cool Roof.
Total Foes paid for pariah: 341.24
People Associated with Project:
Contractor PENGUIN HOME SOLUTIONS INC
21860 VAN BUREN BLVD STE 101 RIVERSIDE, CA 92506
Permit Applicant Jeffrey Hernandez
Owner ARBUSO JOSEPH J & EVA M
872 S ASPEN ST
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
NPHEIM Cq\\
Cityof Anaheim Op (��o
Building Division i
v >
SOUNDED b
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test PFRUILKERED
Electrical Final
-
Plumbing Final „ ,•„
, ,
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-512
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 7655041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Llc. (714) 765-5194 (Allow 10 business days)
SetbacklForms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisVGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been stained
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (SoundlEnergy)
Do not tape or piaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not hackf It unless q nned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service