Loading...
852 N JANSS ST° Permit Types LLD ELE MEC PLM CITY OF ANAHEIM X X BUILDING DIVISION Permit Number: BL02022-03935 200 S. ANAHEIM BLVD. Issued: 08/25/2022 (714) 765 - 5153 www.anaheim.net/building (714)765-4626 Quarter Section: 61 Site Address: 852 N JANSS ST, ANAHEIM, CA 92805 Legal Description: N TR 1019 BLK LOT 2 APN: 03419302 Project Description: Residential Photovoltaic System with Microinverters Living Area: Number of Stones: Valuation: Garage Area: Construction Types: Carpon Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Root: Total Fees paid for Pwmh: People Associated with Project: Permit Applicant Nicholas KATSENIS 3108 GLENDALE BLVD #138 LOS ANGLES, CA 90339 16,500.00 386.15 Type Electrical Fixtures Dry Type Plumbing Fixtures Dry Mechanical Fixtures Dty Meter/Disc Sw - Under 600 V, up to 200 i amps Microinverter 11 Sub PaneVTemp Pwr - Under 600 V. up to 1 200 amps The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PH EtM Cqt P� City of Anaheim OF io Building Division ti i • �DVNDED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 2- Dy 2L Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beensianed Building Final (714765.5163) Last Inspection -Final Only After Above Completed 11�0912Z 1 V V Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned. 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing iOnly after Rag Ere Mec & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 husiness days after approval) Excludes New onstr,ct on terior Plaster (Brown Coat) r (Struct., Ele., or Mec.) 'Interceptor 11kf11],,nl,,s 'neering Backflow (Testable Only) e 0 C m C a E M � O W a £ c r£o c c O M 0 a � c E C Ol t N � C N 0! O , Ln VI C Oi m N f9 c v v N c C1 a m Q � 0 4 m C r r:y d ❑aNN y d N N L d a 5 pC •L O y(7m C1 U W c � U otl U U m a W W R C 41 (� y E N 8, 2 ED 1CD0 N W N j pp a ���nn y a�ioN m a u In p y a N ry m c 8 W S C $ o c U i U L2 U J [f -1 (I (I (I d m t f Q ELL a* ° tr m oN1i Z m m v €" if Qaa `v z d F,-.m alp m z O° 9 U m C m a c mc 5 ° y 6! d C Q j t W W Woe pm2 2 O a H� NMOI° �o r L I I I I 1 1 I 1 1 I I I I I A I I 1 I 1 1 I I O 6 O N o N N N d y a p p p C UUU(S O O O a ° NM owo LO L L L J N (Q V V V a C C C g A o N m m m V) N m m a c 0 U d, to L z °x Z�F g' ❑ F U W d ° o ''O a L Z o U {7 U% N V a O ai U � d a c> s � � c N C C �i a � V � m N d v T � G a a ° CO) U U a m c c � c o U c 0 U a [� UWC7UW 0 r a m Part 3: PV Toolkit for Local Governments 0 California Solar Permitting Guidebook