852 N JANSS ST° Permit Types
LLD ELE MEC PLM CITY OF ANAHEIM
X X
BUILDING DIVISION
Permit Number: BL02022-03935 200 S. ANAHEIM BLVD.
Issued: 08/25/2022 (714) 765 - 5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 61
Site Address: 852 N JANSS ST, ANAHEIM, CA 92805
Legal Description: N TR 1019 BLK LOT 2
APN: 03419302
Project Description: Residential Photovoltaic System with Microinverters
Living Area: Number of Stones:
Valuation:
Garage Area:
Construction Types:
Carpon Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Spnnklered:
Cool Root: Total
Fees paid for Pwmh:
People Associated with Project:
Permit Applicant Nicholas KATSENIS 3108 GLENDALE BLVD #138 LOS ANGLES, CA 90339
16,500.00
386.15
Type Electrical Fixtures Dry Type Plumbing Fixtures Dry Mechanical Fixtures Dty
Meter/Disc Sw - Under 600 V, up to 200 i
amps
Microinverter 11
Sub PaneVTemp Pwr - Under 600 V. up to 1
200 amps
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PH EtM Cqt
P�
City of Anaheim OF io
Building Division ti i
• �DVNDED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
2- Dy 2L
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION I DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beensianed
Building Final (714765.5163)
Last Inspection -Final Only After Above Completed
11�0912Z
1
V
V
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned.
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing iOnly after Rag Ere Mec & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
husiness days after approval) Excludes New
onstr,ct on
terior Plaster (Brown Coat)
r (Struct., Ele., or Mec.)
'Interceptor
11kf11],,nl,,s
'neering Backflow (Testable Only)
e
0
C
m
C
a
E
M
� O
W
a
£ c r£o
c c O
M 0
a � c
E
C Ol t
N � C
N
0!
O , Ln
VI C Oi
m
N
f9
c
v
v
N
c
C1
a m
Q
�
0
4
m
C
r
r:y
d
❑aNN
y d N N
L
d
a 5
pC
•L
O y(7m
C1
U W c
� U otl
U U m
a W W R
C 41 (� y
E
N
8, 2 ED
1CD0
N W
N
j
pp
a
���nn
y a�ioN
m
a u In
p y a N
ry
m
c 8 W
S
C
$ o c U
i
U L2
U
J [f -1 (I (I (I
d
m
t
f
Q
ELL
a*
°
tr
m
oN1i
Z
m
m
v
€"
if
Qaa
`v
z
d
F,-.m
alp
m
z
O°
9
U
m
C
m
a
c
mc
5
°
y
6!
d
C
Q
j
t
W
W
Woe
pm2
2
O
a
H�
NMOI°
�o
r
L
I
I
I
I
1
1
I
1
1
I
I
I
I
I
A
I
I
1
I
1
1
I
I
O
6
O
N
o
N N N d y
a
p p p C
UUU(S
O O O a °
NM owo
LO
L L L J N
(Q
V V V a
C C C g
A o N
m m m V) N m
m
a
c
0
U
d,
to
L
z
°x
Z�F
g' ❑
F
U
W
d
° o
''O
a
L
Z o
U
{7
U%
N
V
a
O
ai
U
�
d
a
c>
s
�
�
c
N
C
C
�i
a
�
V
�
m
N
d
v
T
�
G
a
a
°
CO)
U
U
a
m
c
c
�
c
o
U
c
0
U
a
[�
UWC7UW
0
r
a
m
Part 3: PV Toolkit for Local Governments
0 California Solar Permitting Guidebook