Loading...
631 S ARDEN ST (6)Permit Types BLD ELE MEC PLM XI X Permit Number: BLD2021-01326 Issued:03/24/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 55 Site Address: 631 S ARDEN ST Legal Description: N TR 2381 LOT 41 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Plumbing for sewer clean out, repipe with pex, new underground waste line, and gas line for kitchen range. Valuation: Construcion Types: WA, Total Fees paid for Permit: 540.00 People Associated with Project Owner DONNA BEAULIEU 205 SMITH ST CENTRAL ISLIP NY 117224131 Contractor BIARD & CROCKETT PLUMBING SERVICE 320 E KATELLA AVE #P ORANGE CA 92867 0000 Permit Applicant KYLE BOBROWSKI 320 E KATELLA AVENUE #P ORANGE CA 92867 Type Electrical Fixtures Qty Type Plumbing Fixtures City Type Mechanical Fixtures Qty Repair/Drainage Alteration/Vent Piping 1 Water Distribution 1 Gas System (1-5 outlets) 1 Sewer per 100 ft. 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. p,"Elm �. City of Anaheim ��� O�ip (^o Building DIVISIOn Z i> J. o�'V'DED � Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable Items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final T E F Cross Connection Control (714) 765-4280 R.P ` Engineering Final (714) 765-5126 - a INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrei-: - � the following applicable items have been signed: Fire Dept. Final (714) 765.5041 — Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List(Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subtloor or pour floor slab until the tollwmg applicable items have been sinned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Undergoor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Jolst(Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items ha', been sinned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele. Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service