Loading...
525-1066 N IVORY PALM LN (2)Permit Types BLD ELE MEC PLM X X X X Permit Number: BLD2023-04706 Issued: 01/18/2024 www.anaheim.net/building (714)7654626 Quarter Section: 60 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 525-1066 N IVORY PALM LN, Anaheim, CA 92801 Legal Description: A TR MILES RANCHO BLK LOT 13 MILES RANCHO LOT 13 W APN: 27107110 1211 Project Description: New Residential Construction: 6,006 sf. to construct (4) 3-story attached condos with 2,087 sf. of attached garages,167 sq. ft. of covered porch, 445 sf. of decks and (6) awnings. Install roof mounted solar system. Install (4) EV chargers. REF: TRACT2022-00004 (Tract 19170) Building Type 200 (1) 1,424 sf. 3bd/2.5bths (Plan Type 2A) (1) 1,406 sf. 3bd/2.5bths (Plan Type 2B) (1) 1,432 sf. 3bd/3bths (Plan Type 3B) (1) 1,744 sf. 3bd/3.5fbths (Plan Type 4B) Living Area: 6006 Number of Stones: 3 Valuation: 370,000.00 Garage Area: 2087 Construction Types: VB Carport Area' Occupancy Groups: U1. R2, U7, R2. U1, 112, U1, R2, U1, R2 Balcony I Deck Area: 450 Fire Sprinklered: Cool Roof: Total Feas paid for Permit: 91.675.13 People Associated with Project: Contractor KS HOME COASTAL INC 10990 WILSHIRE BLVD SUITE 700,LEGAL DEPT LEGAL DEPT 199911160813085820 LOS f Permit Applicant Frank Chen 1 Technology Building I, Suite 801 Irvine, CA 92618 Owner LAOS ACRI HARBOR LLC 1085 N HARBOR BLVD Type Electrical Fixtures Cry Type Plumbing Fixtures Oty EV Charger 4 Bath Tub 4 Meter/Disc Sw - Under 600 V, over 200 1 Dishwasher 4 amps to 500 amps Garbage Disposal 4 Meter/Disc Sw - Under 600 V, up to 200 5 amps Gas System (outlets) 4 Microinverter 36 Kitchen Sink 4 Motors - Factory Wired Appliance, up to 1 5 Lavatory 17 Motors - up to 1 h.p. 4 Repair/Drainage Alteration/Van( Piping 4 New or total rewire - garage/carport 2087 Shower 8 New or total rewire - multi -family 6006 Washing Machine Rough 4 Sub Panel/Temp Pwr - Under 600 V, up to 5 Water Closet 13 200 amps Water Distribution 4 Water Heater 4 Mechanical Fixtures City Condenser 4 Heating Appliances, including vent 4 Heating/Cooling Coil 4 Residential Registers (ducts) 86 Ventilation Fan - <= 300 Gm on single duct 21 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNPHEIM Cal City of Anaheim Dk iO Building Division i �D6NDEO t8�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities arq released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept Final (714) 765-6041 Plumbing (Ground/Underfloor Drain Waste) I Water Engineering (714) 7654591 Electrical Ground ElectrodelUfer R I I} 24 3WJA Sub ListfBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) 4 (. ut I W COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicdble items have been sioned: Building Final (714 765-6153) Last Inspection -Final Only After Above Completed t, / ~ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Bu ng ns ections 3/, as 3 Rn A, -01rx- on/6y- otti 2' pt.ArL 161-- Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) oi24 Floor (JoisVGirders) J7Ar- L Q 5'1,frA - / Sr FL Underfloor Insulation (Raised Foundation Only) - 3 l9 1t-1 = 2ra F oo• ha; tv JAM, Floor Nailing (Raised Foundation Only) - I at 24- to to trisOciiii0m, 2nd Floor (Floor Nailing) I ;I - N / L S 15 Do not cover or conceal the work below until the following applicable items havebeen sioned r{ 1st Floor Shear / j •1$'•r e.-i, l+il, Firesprinkler (Rough) (Fire Dept.) Mechanical Insiriections bH r w� j Su%a-1r�.. /"/i�-� �-• �r.J Ali 2nd Floor Shear ; y 2y q M . Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) v� Iw/' I S Rough Plumbing (Top Out) I j ,f �-�^S— � 1✓� S �'-P Rough Duct (Mechanical) / J Pt Rough Mechanical / of qc> 1 V__5 e0 J Rough Electrical Rough COA/Mita ation Measures Plumbina Inspections ^ y g a e/•.., �b^' z� r r�'`�e �' Framing (Only after Plbg., Ele., Mec. & Fire) /} / i Insulation (Sound/Energy) JV/-oGG ei 3 A Do not tape or plaster until the following applicable items have been signed: � 9 J9 I I-e J� `( -�. $` Drywall f� car• .v Drywall Penetrations (Ele, Mec & Plbg) Z f `� I A rites, i Interior Lath Exterior Lath if D Electrical Insoections „J C XAL ta4. // f.Aj .�j 1�s'T-�mTrB- -r�- //""�l f� �` c}- C.iC.r"'C Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar(Struct., Ele., or Mec.) Grease Interceptor fDo not backfill unless sr I' Sewer dY ori� L��•.`Y w�f.n / Water Engineering Backflow (Testable Only) Water Service s iz o / J Tilrvw "jo, it Page 1 Structural Palm Court Structural Observation Report#6 Job #: 10-11852 Date of Observation: 4/12124 Date: 4/12/24 Page: 1 of 5 Structural Observation Requested by: Structural Observation performed by: Area Observed: Vince Vojeda Shawn Afshar, PE Phase 1, Building 6, Lots 28-31, Type 200, Framing all levels, See attached for the area observed. Observed Structural Elements and their connections ❑ Foundation ❑ Floor ❑ Roof Sheathing ® Exterior ® Framing ❑ Others ❑ Footing & Slab Sheathing ® I" Level ® V Level ❑ Holdown, ❑ 2nd Floor ® 2n' Level ® 20'Level Anchor bolts & ❑ 3r1 Floor M 3rd Level ® 3' Level Associated Rebars ❑ 4" Floor m ❑ 4 Level ro ❑ 4 Level Status of Construction E Roof Trusses E Stair Installed E Bathtub Installed E Roof Sheathing E Window Installed E Preliminary Drywall Installed E Roof Loaded E Flashing Installed E Drywall Stacked in Units E Second Floor wall ❑ Building Wrapped ❑ Drywall on Wall ® Third Floor Wall ❑ Building Stuccoed ❑ Drywall on Ceiling ❑ Fourth Floor Wall E MEP installation on going ❑ Sheathing one side Party Wall Pursuant to your request, a visit to the project site was made on the above date to perform a structural observation in conformance with 2019 CBC 1702 and 1704.6. Please note, not all symmetric or repetitive areas were observed, therefore please have your field personnel verify the correction items in all similar areas. Where repair recommendations are given, verify if additional coordination may be necessary with other trades or design professionals. RFIs where requested must go to the Architect for distribution. The structural observations do not constitute an approval of the work nor do they relieve the contractor or inspection agencies from complying with project and code requirements. All observations were conducted from the ground or floor level and no testing or inspection was performed. Our observations do not include a review of the contractors means or methods of construction, shoring, erection, bracing, nor any associated safety precautions. 1: (714) 978 9780 IF: (714) 978-9788 1 www.vr as uuctara I. r om 1 1845 W. Orangewood Avc., SL2. 200 1Grange, CA 92868 STRUCTURAL OBSERVATION REPORT FORM STRUCTURAL OBSERVATION means the visual observation of the structural system, for general conformance to the approved plans and specifications, at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspections required by Section 108, 1701 or other sections of the code. This report includes all construction work througt Report No.. _ 12e _ day of April 2024 Pape No. of Prulerl Aaamss S,no:Wral observer of Remra (SOR) Phone No. el SOS 1075-7085 N. Harbor Blvd. Anaheim CA 92801 Mark A. Vangaale 714-978-9780 Pemnl Nu SVPClurel Observsl on Pevonneo by Proresran l Llc'Reg No of Observer Phone No of Observe, VCA C-58680 714-978-9780 OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS FOUNDATION WALL FRAMES FLUOR ELEMENTS/CONNECTION OBSERVATION LOCATION ❑ Footing. Stem Walls Piers ❑Concrete :]Steel Moment Frame ❑Concrete Phase 1, Building #6, Lots 28-31, Framing & shear ['Mat Foundation ❑Masonry El Steel Braced Frame ❑Steel Deck connectors all levels. F Caisson, Piles, Grade Beams xWOod [;Concrete Moment X Wood Frame rl Stepp'g(Retam'g Foundation, G Others: I Masonry Wall Frame C Others Hillside Special eclal Anchors NOTED DEFICIENCIES with the proposed corresponding corrective actions with respect to general conformance with the approved plans or in the bad path: (A final report by the structural observer which states that all observed deficiencies have been resolved is required before acceptance ofthe work by the building officials,) No Observed Deficiencies I DECLARE THATTHE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE.. r---------- 1. 1 AM THE ENGINEER OR ARCHITECT RETAINED BY THE OWNER TO BE IN RESPONSIBLE CHARGE FOR THE STRUCTURAL OBSERVATION IN ACCORDANCE W rFHTHE REQUIREMENTS OF THE CITY OF RIVERSIDE 2 I, OR ANOTHER ENGINEER OR ARCHITECT WHO I HAVE DESIGNATED ABOVE AND IS UNDER MY RESPONSIBLE CHARGE, HAS PERFORMED THE REQUIRED SITE VISITS AT EACH SIGNIFICANT CONSTRUCTION STAGE TO VERIFY IFTHE STRUCTURE IS IN GENERAL CONFORMANCE WITH APPROVED PLANS AND SPECIFICATIONS; 3 ALL NOTED DEFICIENCIES WHIC REMAIN TO BE CORRECTED HAVE BEEN INDICATED ABOVE; 4. 1 RECOMMEND THAT ACC PT CE OF THE STRUCTURAL SYSTEMS BY THE CITY OF Anaheim BI=wl NT A L OBSERVED DEFICIENCIES ARE CORRECTED. / 4/12/2024 SIGNATURE OF ST UCTURAL OBSERVER DATE Per CBC 2019 Sec 1702 & 1704.6 STAMP OF STRUCTURAL OBSERVER 94 Appendix D: Certificate of Completion LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that (1) I am a professional appropriately licensed in the State of California to provide professional landscape design services for: Tract 19170 1075 N. Harbor Blvd., Anaheim, CA (818.928.2690) (project name, mailing address and telephone). (2) The landscape project for the property located at 1075 N. Harbor Blvd., Anaheim, CA (818.928.2690) (provide street address or parcel number(s)) was installed by me or under my supervision. (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Anaheim Landscape Water Efficiency Ordinance (Chapter 10.19 of Title of 10 of Anaheim Municipal Code) and the Guidelines for Implementation of the City of Anaheim Landscape Water Efficiency Ordinance. (4) The following elements are attached hereto: a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and Irrigation audit to be completed once all irrigation has been installed and prior to final certification. d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. WYes ❑ No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. Yes ❑ No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the Guidelines for Implementation of the City of Anaheim Landscape Water Efficiency Ordinance. 27 Kim Takaki Print Name llg,aIlY"9 db, Km 1.M Kim Takaki-0 ::"N.01.3007:2110 07/30/2024 Date 5508 Signature License Number 28924 Old Town Front Street, Suite 202 Temecula CA 92590 Address (844)934-5263 A 701 Telephone Landscape Design Professional's Stamp (If Appropriate) LLA 5508 SIGNATURE 1 09/3012024 W. DATE 28 ktakaki@w-d-g.com E-mail Address