Loading...
124 S LEANDRO ST (2)Permit Types BLD 1 ELE MEC PLM X Permit Number: BLD2024-03189 Issued: 06/20/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 191 CITY OF ANAHEIM Site Address: 124 S LEANDRO ST, ANAHEIM, CA 92807 Legal Description: N TR 7118 BLK LOT 56 APN: 36311221 Project Description: Residential EV Charger Level 2 Living Area: Number of Stones: Garage Area: Carport Area: Balcony / Deck Area, Cool Root. BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765 • 5153 Valuation: 0.00 Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for permit: 172.00 People Associated with Project: Contractor EVNATION LLC 3100 AIRWAY AVE STE 133 COSTA MESA, CA Permit Applicant Pat Park 3100 Airway Ave #133 Costa Mesa, CA 92626 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures EV Charger i The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�pHE1M �q< City of Anaheim Building Division i u i 'fj DED taa^ Do not occupy this buildino until the final inspections have been made. FINAL INSPECTIONS DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Lifer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migatlon Measures Do not install subfloor or pour floor slab until the tollwing applicable items have been stoned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service