124 S LEANDRO ST (2)Permit Types
BLD 1 ELE MEC PLM
X
Permit Number: BLD2024-03189
Issued: 06/20/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 191
CITY OF ANAHEIM
Site Address: 124 S LEANDRO ST, ANAHEIM, CA 92807
Legal Description: N TR 7118 BLK LOT 56
APN: 36311221
Project Description: Residential EV Charger Level 2
Living Area: Number of Stones:
Garage Area:
Carport Area:
Balcony / Deck Area,
Cool Root.
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765 • 5153
Valuation: 0.00
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for permit: 172.00
People Associated with Project:
Contractor EVNATION LLC 3100 AIRWAY AVE STE 133 COSTA MESA, CA
Permit Applicant Pat Park 3100 Airway Ave #133 Costa Mesa, CA 92626
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures
EV Charger i
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�pHE1M �q<
City of Anaheim
Building Division i
u i
'fj DED taa^
Do not occupy this buildino until the final inspections have been made.
FINAL INSPECTIONS
DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Lifer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migatlon Measures
Do not install subfloor or pour floor slab until the tollwing applicable items have been
stoned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sioned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service