Loading...
832 S VERONA ST BPermit Types SLID ELE MEC PLM x x x x Permit Number: BLD2024-02836 Issued: 06/03/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 21 Site Address: 832 S VERONA ST B, Anaheim, CA 92804 Legal Description: N TR 1951 BLK LOT 102 APN: 12620508 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 _.'CHI IAf \J r z Project Description: (ADU) Residential Addition: Convert 409 sq. ft. attached garage with 121 sq. ft. addition into new accessory dwelling unit. (lbd/lbth) REF:BLD2024-02834 (BLD2023-02187) Living Area: Number of Stories: 1 Valuation: 75,000.00 Garage Area: Construction Types: VB careen Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Parma: 0.00 People Associated with Project: Contractor BENJAMIN BINH KHONG 1130 W CHATEAU AVE ANAHEIM, CA 92802 Permit Applicant NGUYEN ERIC HO 8 MISTY D 1130 W CHATEAU AVE ANAHEIM, CA 92802 Owner NGUYEN, NHUQUYNH THI 832 S VERONA ST Type Electrical Fixtures ply Type Plumbing Fixtures Qty Mechanical Fixtures Qty New or total rewire - 1 or 2 family 530 Garbage Disposal 1 Evaporative Cooler (not portable) 1 Sub PanelRemp Pwr - Under 600 V, up to 1 Kitchen Sink 1 Healing Appliances, including vent 1 200 amps Lavatory 1 Residential Registers (ducts) 2 Ventilation Fan - <= 300 cmon single duct 2 Repair/Drainage Alteration/Vent Piping 1 Sewer per 100 ft. 1 Shower 1 Water Closet 1 Water Distribution 1 Water Heater 1 Water Main per 100 ft. 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. _ ` PNPHE�M_ c9t `City of Anaheim Building Division Z Ia� :/•/ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final C- Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765.6041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) 2$-- Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-6194 (Allow 10 business days) Setback/Forms/Trenches (Footings) ) p- Z COAIMigation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been sioned. Building Final (714 765-5153) Last Inspection -Final Only After Above Completed— L / Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) -% &-X, Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stoned 1st Floor Shear — Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) - /11 Masonry (Reinf./Bond Beam/Pre-Grout) ough Plumbing (Top Out) 7-4 Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections raming (Only after Plbg-, Ele., Mec. 8 Fire) - tl G Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec 8 Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat)- T-Bar (Struct., Ele., or Mec-) Grease Interceptor tDc, not backfil[ unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service