745 N VINE ST (2)Permit Types
BLD ELE MEC FILM
X
Permit Number: BLD2021-04297
Issued: 09/29/2021
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 82
Site Address: 745 N VINE ST
Legal Description: N TR 1618 LOT 4
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: Change out (6) retrofit windows and tear off existing roofing material and replacing
with 1,200 sq. ft. of composition shingles over house and attached garage.
Valuation: $5,000,00
Construcion Types: N/A, ,
Total Fees paid for Permit: 508.65
People Associated with Project:
Owner PREMUIM HOME SERVICES, LLC. 745 N VINE ST ANAHEIM CA 92805-2025
Permit Applicant RENE A DELGADO 2655 BRONZEWOOD TUSTIN CA 92782
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. :1 _ ,,,
P�pVIEfM _4
Cityof Anaheim oF�o
Building Division Z
Ul >I
10
GNOEo Leh^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas rest
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-424N
S P
CT
Engineering Final (714) 765-5126 N QT C 0 1r
INSPECTION I
DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete ::net t', lollowing applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
n .
Building Final (714 765-5153) u
Last Inspection -Final Only After Above Completed
/
/,!r//
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
❑o nal m+er or eoneea the work below until the following applicable items have
been sinned
1 at Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Go not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-1Meter volt be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service