Loading...
121 W LA PALMA AVE 1-8Permit Types 1 HLOL,D I ELE MEC PLM I K L X I x I Permit Number: BLD2022-05505 Issued: 05/11/2023 www.an aheim.nettbuilding (714)765-4626 Quarter Section: 70 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. f714)765-5153 Site Address: 121 W LA PALMA AVE 1-8, ANAHEIM, CA 92801 Legal Description: N TR 17846 BLK LOT 1 TRACT NO 17846 LOT 1 POR OF L APW 26715134 �-;v Project Description: New Residential Construction: 12,754 to construct 3-story 8-plex condominiums with 3,638 sq.ft garage, 798 sq.ft deck, EV charger ready and roof mounted solar system. ( Plan 4 280/28A, Plan 5 3BD/28A, Plan 6 4BD/2.58A, Plan 7 3BD/3.58A) PER TRACT2021-00002 Living Area: 12754 Number of Stories: 3 Valuation: 2,442,355.20 Garage Area: 3638 Conseucaon Types: VB Carport Area: Occupancy Groups: . R2, Ut, R2, Ul. R2, U1. R2, U1, R2, U1, R2 Balcony / Deck Area: 798 Fire Spnnklered: Cool Root. Total Fees paid for Permit: 131,204.75 People Associated with Project: Contractor LENNAR HOMES OF CALIFORNIA LLC 2000 FIVEPOINT 3RD FLOOR201407011155160905 IRVINE, CA 92618 Permit Applicant Lem Labrecque Owner LENNAR HOMES OF CALIFORNIA INC 15131 ALTON PKWY 365 Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Oty Meter/Dim Sw - Under 600 V, over 200 1 Bath Tub 8 Air Handling Units 6 amps to 500 amps Dishwasher 8 Compressor/Boiler - up to 15 hp 8 Meter/Disc Sw - Under 600 V, up to 200 9 Heating Appliances, including vent 8 amps Garbage Disposal e Residential Registers 82 Microinverter 16 Gas System (outlets) 8 Ventilation Fan - <- 300 chn on single duct 56 Motors - Factory Wired Appliance, up to 1 16 Kitchen Sink 8 ti New or total rewire - 1 or 2 family 12754 Lavatory 32 New or total rewire - garage/carport 3638 Private Sewage Disposal 8 Sub PanetrTemp Pwr - Under 600 V, up to 9 Shower 10 200 amps Water Closet 22 Water Heater 8 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. ��f,HEIM �q< Cityof Anaheim o� io Building Division F i u > �DVNDED %8�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE I INSPECT%. All applicable items Belo, be signed before utill 'es are released Final Gas Test Electrical Final e Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) f' .1SL Water Engineering (714) 765.4591 Electrical Ground Electrode/Lifer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed ' • �� Plumbing (Ground/Underfloor Water) (/7 0" JSC Underfloor Rough Gas PARTIAL INSPECTIONS BuIldina Ins ections 4 RD Fy,• r,1r 5NYs� - J.5--- Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) 1/ .i Js� Floor (Joist/Girders)�-- i o Underfloor Insulation (Raised Foundation Only) 3 Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) 7 ;y p .iSG d Do not rover or conceal the work below until the following applicable items have Yf rQ �f,w list Floor Shear o2N SL r - Firesprinkler (Rough) (Fire Dept.) Mewhanl2jl In8 c / 2nd Floor Shear oL J M Roo Sheath' /Diaphragm ram H Jc� Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Ndti .St. Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) 9-"2 Insulation (Sound/Energy) �o not tape or plaster until the following applicable items have been signed: Drywall ! l Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer /q JSC Water Engineering Backfiow (Testable Only) Water Service j option one CONS UG TING ENGINEERS PAGE 1 OF 1 STRUCTURAL OBSERVATION REPORT CITY of ANAHEIM , CA V1 THIS REPORT INCLUDES ALL CONSTRUCTION WORK THROUGH THE: May,ru, 2024 PROJECT "Palmilla" - MFD Tract-17846 OPTION ONE J. N. 0517-2160 LOCATION Anaheim, California 92809 TRUSS MANUFACTURER Spates Fabricators OWNER Lenmr Homes -California Coastal I -JOIST MANUFACTURER Boise Cascade, BCl Joists ARCHITECT Urban Arena ARCHITECT J.N. 17-016 STRUCT. DES. OF RECORD Ilia Samd, P.E., S.E., S.E.C.B. LIO OR REGISTRATION No. S-3855 STRUCTURAL OBSERVER Erik Torres, E.I.T. LIC. OR REGISTRATION No. OBSERVED STRUCTURAL ELEMENTS & THEIR CONNECTIONS: LOT(S) & PHASE OBSERVED: Interior and Exterior General Framing; i.e., roof trusses, roof sheathing, Plmse: J Building 83. Tvoe: 500 shear elements, holdowns, floor sheathing, floor trusses, beams, headers, and Homesites H: 137 to 144, general hardware. 121 W. la Palma Ave., units 1-8 OBSERVED DEFICIENCIES: (ATrACHA DTT0NALPAGFSrFbTK HART The deficiencies noted during the observation visit have been corrected and/or installed by a collaborated effort of the foreman and project superintendent. (where visible see note below) Note: Portions of the Stuctme was covered by drywall, insulation, plywood sheathing and framing elements not verified by Option One Consulting Engineers. Construction Stage: N/A El ❑x Eleccrkal ElPlumbing Anaheim, California 92909 Initial /Completion Date 74 E.T. 5IL612024 ❑ Double 51de4 ❑ FVvood ClIg ❑ Deck Shear Walls LW(o) OPdon ❑X Truss book layouts and details on job -ore verified wnh construalon manager. NgIL When box is checked it indicates that construction stage is in progress, and it has not yet been completed at the time of observation was conducted ❑ STRUCTURAL SYSTEM WAS VISUALLY OBSERVED TO BE IN GENERAL CONFORMANCE WITH THE APPROVED PLANS ❑ STRUCTURAL DEFICIENCIES ARE OF A MINOR NATURE & MAY BE REVIEWED BY CITY BLDG INSPECTOR FOR COMPLIANCE I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MV KNOWLEDGE AND BELIEF 1. I AM THE REGISTERED ENGINEER WHO HAS RESPONSIBLE CHARGE FOR THE STRUCTURAL OBSERVATION. 2. I, OR ANOTHER QUALIFIED -CHARGE OBSERVER WHO 1 HAVE DESIGNATED ABOVE AND IS UNDER MY RESPONSIBLE CHARGE, HAS PERFORMED THE REQUIRED SITE VISITS AT EACH SIGNIFICANT CONSTRUCTION STAGE TO VERIFY IF THE STRUCTURE IS IN GENERAL CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. 3. ALL DEFICIENCIES, WHICH I DOCUMENTED, HAVE BEEN CORRECTED UNLESS OTHERWISE INDICATED ABOVE. 4. ALL OBSERVED DEFICIENCIES SHALL BE CORRECTED AND APPROVED BY THE OBSERVER PRIOR TO FINAL ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY THE BUILDING DEPARTMENT. 5. THIS REPORT IS PROVIDED TO THE OWNER AS A PART OF THE OWNERS OVERALL CONSTRUCTION QUALITY CONTROL PROGRAM 6. OPTION ONE HAS PROVIDED STRUCTURAL OBSERVATION IN ACCORDANCE WITH THE SEACC RECO D GUIDELINES FC( THE PRACTICE OF STRUCTURAL. ENGINEERING ALIFORNIA. A S4g90 N0. S 3855 P. 3/31/2026 7TF RUCT \l`jt Of �L\E MavZ 2024 STAMP OF ENGINEER -OF -RECORD STRUCTURAL OBSERVATION DOES T W THE REQUIREMENTS FOR INSPECTIONS BY CITY BUILDING INSPECTORS. ALL WORK MUST COMPLY APPROVED PLANS AND APPLICABLE STATE & LOCAL CODES. 2460-SOR Fnng_BIdg3_units 137-144_5-10-24.Ws Option One Tel 714.556.1916 Consulting Engineers 2755 Bristol Street, Suite 100, Costa Mew, Ca. 92626 Fax 714.556.1952 Kimley>»Horn October 2, 2024 Ms. Lani Labrecque Lennar 2000 Fivepoint, 3rd Floor Irvine. CA 92618 Reference: 125 West La Palma Avenue, Anaheim, CA Civil Grading Certification — (Phase 4 - Building 3 - Units 137-144) Dear Ms. Labrecque: Kimley-Horn has performed a site walk for the above referenced Project Building and has determined to the best of our knowledge that the grading and drainage improvements have been completed in substantial compliance to the approved Grading Plans. Please contact me if you have any questions. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. By: Jon Wakenhut, PE Vice President I - �:_:,,.f.:,' 11"gwrtion & Mweri'ds'Trating SOUTHWEST A&A&A&A&I&A&A&A& A&A& thispeclioll & Testing, 111C. 441 CUIII111CIUi;11 \\;,1, Lit I Libra, CA 9003 1 -0 169 1 941-2990 • (714) 526-8441 FAX (562) 946-0026 September 17, 2024 City of Anaheim Department of Building & Safety 200 South Anaheim Blvd. Anaheim, CA 92805 SPECIAL INSPECTOR'S FINAL PROJECT REPORT Project Name: Palmilla — Building 3. Phase 4 Address: Tract 17846, Anaheim Owner: Lennar Homes Unit# Address Permit # Unit# Address Permit # 137 121 W La Palma Ave #8 BLD2022-05505 138 121 W La Palma Ave #7 Bld2022-05505 139 121 W La Palma Ave #6 BLD2022-05505 140 121 W La Palma Ave #5 Bld2022-05505 141 121 W La Palma Ave #4 BLD2022-05505 142 121 W La Palma Ave #3 BId2022-05505 143 121 W La Palma Ave #2 BLD2022-05505 144 121 W La Palma Ave #1 Bld2021-05505 This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection on the above -mentioned project at the above address, which required special inspection per section 1701 of the California Building Code. Jeff Masters- Post Tensioned Concrete, Reinforced Concrete, SIR2006-00045 Robert Langer, Shear Nailing, Wood Framing, SIR2012-00017 Jason Sharobeem- Reinforced Concrete #9662561 Based upon special inspection and materials testing written reports of this work, it is our judgment that the inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and applicable workmanship provis�ion of the California Building Code. Sincerely, d Steven L. Godbey President SLG/IRW: dfk Reviewed By: C441pi9 * eXa.3.31.�s Ian R. Waddell, P.E. Principal Engineer r' responsibility expressed or implied !.e Appendix D: Certificate of Completion LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that: (1) I am a professional appropriately licensed in the State of California to provide professional landscape design services for: Palmilla Building 3, Phase 4 BLD 2022-05505 (project name, mailing address and telephone). (2) The landscape project for the property located at: 121 W. La Palma Avenue, Anaheim, CA (provide street address or parcel number(s)) was installed by me or under my supervision. (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Anaheim Landscape Water Efficiency Ordinance (Chapter 10.19 of Title of 10 of Anaheim Municipal Code) and the Guidelines for Implementation of the City of Anaheim Landscape Water Efficiency Ordinance. (4) The following elements are attached hereto: a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. X Yes No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. X Yes No 27 .r-F (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the Guidelines for Implementation of the City of Anaheim Landscape Water Efficiency Ordinance. Rick Polhamus Print Name 10-3-24 Date RLA 2782 Signature License Number 3190 B-2 Airport Loop Drive Costa Mesa, CA 9262 Address 949-644-9370 Telephone E-mail Address Landscape Design Professional's Stamp (If Appropriate) 2782 PW