121 W LA PALMA AVE 1-8Permit Types
1 HLOL,D I ELE MEC PLM
I K L X I x I
Permit Number: BLD2022-05505
Issued: 05/11/2023
www.an aheim.nettbuilding
(714)765-4626
Quarter Section: 70
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
f714)765-5153
Site Address: 121 W LA PALMA AVE 1-8, ANAHEIM, CA 92801
Legal Description: N TR 17846 BLK LOT 1 TRACT NO 17846 LOT 1 POR OF L
APW 26715134
�-;v
Project Description: New Residential Construction: 12,754 to construct 3-story 8-plex condominiums with 3,638 sq.ft garage, 798 sq.ft
deck, EV charger ready and roof mounted solar system. ( Plan 4 280/28A, Plan 5 3BD/28A, Plan 6 4BD/2.58A, Plan 7 3BD/3.58A) PER
TRACT2021-00002
Living Area: 12754 Number of Stories: 3 Valuation: 2,442,355.20
Garage Area: 3638 Conseucaon Types: VB
Carport Area: Occupancy Groups: . R2, Ut, R2, Ul. R2, U1. R2, U1, R2, U1, R2
Balcony / Deck Area: 798 Fire Spnnklered:
Cool Root. Total Fees paid for Permit: 131,204.75
People Associated with Project:
Contractor LENNAR HOMES OF CALIFORNIA LLC 2000 FIVEPOINT 3RD FLOOR201407011155160905 IRVINE, CA 92618
Permit Applicant Lem Labrecque
Owner LENNAR HOMES OF CALIFORNIA INC 15131 ALTON PKWY 365
Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Oty
Meter/Dim Sw - Under 600 V, over 200
1
Bath Tub
8
Air Handling Units 6
amps to 500 amps
Dishwasher
8
Compressor/Boiler - up to 15 hp 8
Meter/Disc Sw - Under 600 V, up to 200
9
Heating Appliances, including vent 8
amps
Garbage Disposal
e
Residential Registers 82
Microinverter
16
Gas System (outlets)
8
Ventilation Fan - <- 300 chn on single duct 56
Motors - Factory Wired Appliance, up to 1
16
Kitchen Sink
8
ti
New or total rewire - 1 or 2 family
12754
Lavatory
32
New or total rewire - garage/carport
3638
Private Sewage Disposal
8
Sub PanetrTemp Pwr - Under 600 V, up to
9
Shower
10
200 amps
Water Closet
22
Water Heater
8
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
��f,HEIM �q<
Cityof Anaheim o� io
Building Division F i
u >
�DVNDED %8�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE I INSPECT%.
All applicable items Belo, be signed before utill 'es are released
Final Gas Test
Electrical Final
e
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
f'
.1SL
Water Engineering (714) 765.4591
Electrical Ground Electrode/Lifer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
' • ��
Plumbing (Ground/Underfloor Water)
(/7 0"
JSC
Underfloor Rough Gas
PARTIAL INSPECTIONS
BuIldina Ins ections
4 RD Fy,• r,1r 5NYs� - J.5---
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
1/ .i
Js�
Floor (Joist/Girders)�--
i o
Underfloor Insulation (Raised Foundation Only)
3
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
7 ;y
p
.iSG
d
Do not rover or conceal the work below until the following applicable items have
Yf rQ �f,w
list Floor Shear
o2N
SL
r -
Firesprinkler (Rough) (Fire Dept.)
Mewhanl2jl In8 c /
2nd Floor Shear oL J
M
Roo Sheath' /Diaphragm ram
H
Jc�
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Ndti
.St.
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
9-"2
Insulation (Sound/Energy)
�o not tape or plaster until the following applicable items have been signed:
Drywall
!
l
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
/q
JSC
Water Engineering Backfiow (Testable Only)
Water Service
j option
one
CONS UG TING ENGINEERS
PAGE 1 OF 1
STRUCTURAL OBSERVATION REPORT
CITY of ANAHEIM , CA V1
THIS REPORT INCLUDES ALL CONSTRUCTION WORK THROUGH THE: May,ru, 2024
PROJECT "Palmilla" - MFD Tract-17846 OPTION ONE J. N. 0517-2160
LOCATION Anaheim, California 92809 TRUSS MANUFACTURER Spates Fabricators
OWNER Lenmr Homes -California Coastal I -JOIST MANUFACTURER Boise Cascade, BCl Joists
ARCHITECT Urban Arena ARCHITECT J.N. 17-016
STRUCT. DES. OF RECORD Ilia Samd, P.E., S.E., S.E.C.B. LIO OR REGISTRATION No. S-3855
STRUCTURAL OBSERVER Erik Torres, E.I.T. LIC. OR REGISTRATION No.
OBSERVED STRUCTURAL ELEMENTS & THEIR CONNECTIONS: LOT(S) & PHASE OBSERVED:
Interior and Exterior General Framing; i.e., roof trusses, roof sheathing, Plmse: J Building 83. Tvoe: 500
shear elements, holdowns, floor sheathing, floor trusses, beams, headers, and Homesites H: 137 to 144,
general hardware. 121 W. la Palma Ave., units 1-8
OBSERVED DEFICIENCIES: (ATrACHA DTT0NALPAGFSrFbTK HART
The deficiencies noted during the observation visit have been corrected and/or installed
by a collaborated effort of the foreman and project superintendent. (where visible see note below)
Note: Portions of the Stuctme was covered by drywall, insulation, plywood sheathing
and framing elements not verified by Option One Consulting Engineers.
Construction Stage: N/A El ❑x Eleccrkal ElPlumbing
Anaheim, California 92909
Initial /Completion Date
74
E.T. 5IL612024
❑ Double 51de4 ❑ FVvood ClIg ❑ Deck
Shear Walls LW(o) OPdon
❑X Truss book layouts and details on job -ore verified wnh construalon manager.
NgIL When box is checked it indicates that construction stage is in progress, and it has not yet been completed at the time of observation was conducted
❑ STRUCTURAL SYSTEM WAS VISUALLY OBSERVED TO BE IN GENERAL CONFORMANCE WITH THE APPROVED PLANS
❑ STRUCTURAL DEFICIENCIES ARE OF A MINOR NATURE & MAY BE REVIEWED BY CITY BLDG INSPECTOR FOR COMPLIANCE
I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MV KNOWLEDGE AND BELIEF
1. I AM THE REGISTERED ENGINEER WHO HAS RESPONSIBLE CHARGE FOR THE
STRUCTURAL OBSERVATION.
2. I, OR ANOTHER QUALIFIED -CHARGE OBSERVER WHO 1 HAVE DESIGNATED
ABOVE AND IS UNDER MY RESPONSIBLE CHARGE, HAS PERFORMED THE
REQUIRED SITE VISITS AT EACH SIGNIFICANT CONSTRUCTION STAGE TO
VERIFY IF THE STRUCTURE IS IN GENERAL CONFORMANCE WITH THE
APPROVED PLANS AND SPECIFICATIONS.
3. ALL DEFICIENCIES, WHICH I DOCUMENTED, HAVE BEEN CORRECTED UNLESS
OTHERWISE INDICATED ABOVE.
4. ALL OBSERVED DEFICIENCIES SHALL BE CORRECTED AND APPROVED BY THE
OBSERVER PRIOR TO FINAL ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY
THE BUILDING DEPARTMENT.
5. THIS REPORT IS PROVIDED TO THE OWNER AS A PART OF THE OWNERS
OVERALL CONSTRUCTION QUALITY CONTROL PROGRAM
6. OPTION ONE HAS PROVIDED STRUCTURAL OBSERVATION IN ACCORDANCE
WITH THE SEACC RECO D GUIDELINES FC( THE PRACTICE OF
STRUCTURAL. ENGINEERING ALIFORNIA. A
S4g90
N0. S 3855
P. 3/31/2026
7TF RUCT \l`jt
Of �L\E
MavZ 2024
STAMP OF ENGINEER -OF -RECORD
STRUCTURAL OBSERVATION DOES T W THE REQUIREMENTS FOR INSPECTIONS BY CITY BUILDING
INSPECTORS. ALL WORK MUST COMPLY APPROVED PLANS AND APPLICABLE STATE & LOCAL CODES.
2460-SOR Fnng_BIdg3_units 137-144_5-10-24.Ws
Option One Tel 714.556.1916
Consulting Engineers 2755 Bristol Street, Suite 100, Costa Mew, Ca. 92626 Fax 714.556.1952
Kimley>»Horn
October 2, 2024
Ms. Lani Labrecque
Lennar
2000 Fivepoint, 3rd Floor
Irvine. CA 92618
Reference: 125 West La Palma Avenue, Anaheim, CA
Civil Grading Certification — (Phase 4 - Building 3 - Units 137-144)
Dear Ms. Labrecque:
Kimley-Horn has performed a site walk for the above referenced Project Building and has
determined to the best of our knowledge that the grading and drainage improvements
have been completed in substantial compliance to the approved Grading Plans.
Please contact me if you have any questions.
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
By: Jon Wakenhut, PE
Vice President
I - �:_:,,.f.:,' 11"gwrtion & Mweri'ds'Trating
SOUTHWEST A&A&A&A&I&A&A&A& A&A&
thispeclioll & Testing, 111C. 441 CUIII111CIUi;11 \\;,1, Lit I Libra, CA 9003 1 -0 169
1 941-2990 • (714) 526-8441
FAX (562) 946-0026
September 17, 2024
City of Anaheim
Department of Building & Safety
200 South Anaheim Blvd.
Anaheim, CA 92805
SPECIAL INSPECTOR'S FINAL PROJECT REPORT
Project Name: Palmilla — Building 3. Phase 4
Address: Tract 17846, Anaheim
Owner: Lennar Homes
Unit# Address
Permit #
Unit# Address Permit #
137
121 W La Palma Ave #8
BLD2022-05505
138
121 W La Palma Ave #7 Bld2022-05505
139
121 W La Palma Ave #6
BLD2022-05505
140
121 W La Palma Ave #5 Bld2022-05505
141
121 W La Palma Ave #4
BLD2022-05505
142
121 W La Palma Ave #3 BId2022-05505
143
121 W La Palma Ave #2
BLD2022-05505
144
121 W La Palma Ave #1 Bld2021-05505
This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special
inspection on the above -mentioned project at the above address, which required special inspection per
section 1701 of the California Building Code.
Jeff Masters- Post Tensioned Concrete, Reinforced Concrete, SIR2006-00045
Robert Langer, Shear Nailing, Wood Framing, SIR2012-00017
Jason Sharobeem- Reinforced Concrete #9662561
Based upon special inspection and materials testing written reports of this work, it is our judgment
that the inspected work was performed to the best of our knowledge, in accordance with the
approved plans, specifications and applicable workmanship provis�ion of the California Building Code.
Sincerely,
d
Steven L. Godbey
President
SLG/IRW: dfk
Reviewed By:
C441pi9
* eXa.3.31.�s
Ian R. Waddell, P.E.
Principal Engineer r'
responsibility expressed or implied
!.e
Appendix D: Certificate of Completion
LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION
I hereby certify that:
(1) I am a professional appropriately licensed in the State of California to provide
professional landscape design services for:
Palmilla Building 3, Phase 4 BLD 2022-05505
(project name, mailing address and telephone).
(2) The landscape project for the property located at:
121 W. La Palma Avenue, Anaheim, CA
(provide street address or parcel number(s)) was installed by me or under my
supervision.
(3) The landscaping for the identified property has been installed in substantial conformance
with the approved Landscape Documentation Package and complies with the requirements of the
City of Anaheim Landscape Water Efficiency Ordinance (Chapter 10.19 of Title of 10 of
Anaheim Municipal Code) and the Guidelines for Implementation of the City of Anaheim
Landscape Water Efficiency Ordinance.
(4) The following elements are attached hereto:
a. Irrigation scheduling parameters used to set the controller;
b. Landscape and irrigation maintenance schedule;
c. Irrigation audit report; and
d. Soil analysis report, if not submitted with Landscape Documentation Package, and
documentation verifying implementation of the soil report recommendations.
(5) The site installation complies with the following:
a. The required irrigation system has been installed according to approved plans and
specifications and if applicable, any prior approved irrigation system alternatives.
X Yes No
b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler &
Emitter Standard.
X Yes No
27
.r-F
(6) The information I have provided in this Landscape Installation Certificate of Completion
is true and correct and is hereby submitted in compliance with the Guidelines for Implementation
of the City of Anaheim Landscape Water Efficiency Ordinance.
Rick Polhamus
Print Name
10-3-24
Date
RLA 2782
Signature License Number
3190 B-2 Airport Loop Drive Costa Mesa, CA 9262
Address
949-644-9370
Telephone E-mail Address
Landscape Design Professional's Stamp
(If Appropriate)
2782
PW