Loading...
550 S AVENIDA FAROtV OrJ1 �� Permit Types BLD 1 ELE MEC PLM X Perrgit number. BLD2024.03448 Issued: 07/08/2024 www.anaheim.net/building (714)7654626 Quarter Section: 186 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 550 S AVENIDA FAROANAHEIM, CA 92807 Legal Description: N TR 8533 BLK LOT 16 APN: 36327216 h Project Description: Residential EV Charger Level 2 Living Area: Number of Stories: Valuation: 0,00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 172,00 People Associated with Project: Contractor CZ ELECTRIC 180 N. ROSE BLOSSOM LANE ANAHEIM, CA 92807 Permit Applicant Zoltan Csemus Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. KPH El M cq , City of Anaheim oar -o Building Division ' Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities ace released pp g ' Final Gas Test Electrical Final (0A Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765.6041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklForms(rrenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signed Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphregmlFrame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele-. Mec. 8 Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service