550 S AVENIDA FAROtV OrJ1 ��
Permit Types
BLD 1 ELE MEC PLM
X
Perrgit number. BLD2024.03448
Issued: 07/08/2024
www.anaheim.net/building
(714)7654626
Quarter Section: 186
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 550 S AVENIDA FAROANAHEIM, CA 92807
Legal Description: N TR 8533 BLK LOT 16
APN: 36327216
h
Project Description: Residential EV Charger Level 2
Living Area: Number of Stories:
Valuation: 0,00
Garage Area:
Construction Types:
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit: 172,00
People Associated with Project:
Contractor CZ ELECTRIC
180 N. ROSE BLOSSOM LANE ANAHEIM, CA 92807
Permit Applicant Zoltan Csemus
Type Electrical Fixtures Qty Type
Plumbing Fixtures Qty Mechanical Fixtures Qty
EV Charger 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
KPH El M cq
,
City of Anaheim oar -o
Building Division
'
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities ace released
pp g '
Final Gas Test
Electrical Final
(0A
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 7655041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765.6041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklForms(rrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
signed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphregmlFrame)
Masonry (Reinf.lBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele-. Mec. 8 Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service