Loading...
790 S BUNTING CT (2)Perm% Types BUD ELE MEC PLM X Permit Number: BLD2024-05057 Issued: 09/23/2024 www.a naheim.net/bu ilding (714)765.4626 Quarter Section: 210 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 790 S BUNTING CT, ANAHEIM, CA 92808 Legal Description: N TR 9745 BLK LOT 5 TR 9745 LOT 5 AND FOR OF LOT 4 APN: 35648115 Project Description: Reroof: Remove and install Tile relay (28) squares over house and attached garage LNing Area: Number of Stories: 0 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony) Deck Area: Fire Spnnklared: Cool Roof. Total Fass paid for Panne: People Associated with Project: Contractor GREEN LADDER ROOFING COMPANY 81 PEPPER ST PASADENA, CA Permit Applicant David Reyes Owner HUYNH, VU N TR THE HUYNH 790 S BUNTING CT 10,000.00 N/A 623.30 Type Electrical Fixtures Dry Type Plumbing Fixtures Dry Mechanical Fixtures Dh The penult shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. PHei,ti-� City of Anaheim P�.. - q;,. 0 !o, Building Division �,' z IU, ' .- Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 766-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Formsrrrenches (Footings) 1COAJMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 7655153) Last Inspection -Final Only After Above Completed IU/I�✓pl _g I ' ni: r`7- ° ) Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg Ele Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mae & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2 3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service y NB NB ENGINEERING IN(' City of Anaheim NB Engineering Inc 71O too, , g er 19119 Colima Rd, Unit L 11, v Rowland Heights, CA.91748 September 16, 2024 626-269-9321 'r I J I{ of u?R — o .�oS7 s a,o O NB Engineering performed an observation for a residential building at 790 Bunting Ct, Anaheim, CA 92808 This report consists of a field observation of the property as well as the opinions based on our findings. The field observation was initially performed on September 6, 2024. The owner was present during the observation. This report is intended to focus primarily on the existing roof framing that were visible and accessible at the time of inspection. Our opinions are based on generally accepted practices and professional experience with similar conditions. This report may not be construed as a guarantee or warranty of the performance of the structure under future adverse circumstances. Based on our observation, the existing roof framing is a conventional wood framing with rafters and ceiling joists. The roof sheathing is plywood. The roof framing is structurally sound at the time of observation. Foundation was not observed. It is our opinion the reroofing is OK with the same weight as the existing roofing material. i _ '.-Pl-rill DOGS ANY OF TH- BUILD! ,• - - -HE CITY. THE HCi!.t _ ';IS PFHMIT H(OCELDS E,T I-'I6 OWN RISK. SEP 2 3 2024 BUILDING DIVISION OF AN =1Ni APPROVE17' BY Q OF Esslo ��� -Jfen*g Geo c ssai°�;. 6 Civil Engineer , Page 1 of 2