145 S LEANDRO ST (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-05157
Issued: 09/26/2024
www.anaheim.net/building
(714)765-0626
Quarter Section: 191
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Site Address: 145 S LEANDRO ST, Anaheim, CA 92807
Legal Description: N TR 7118 ELK LOT 2
APN: 36311319
Project Description: Reroof: Remove and install (38) squares of composition shingles over house and attached garage
Living Area: Number of Settles:
0 Valuation: 24.000.00
Garage Area:
Construction Types: N/A
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered:
Cool Rcof:
Total Fees paid for Perma: 385.12
People Associated with Project:
Contractor BREA ROOFING
171 GEMINI AVENUE BREA, CA 92821
Permit Applicant Daniel JustinShirley
171 Gemini Ave Brea, CA 92821
Owner LU, ANDREW J
145 S LEANDRO ST
Type Electrical Fixtures Qty Type
Plumbing Fixtures City Mechanical Fixtures Cry
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PaptiEIM �q<
Cityof Anaheim o4 , iO
Building Division i
s
OVNDFO 18h
Do not occupy this buildino until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 7665126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground ElectrodelUfer
Sub LIstIBUS. Lic. (714) 7655194 (Allow 10 business days)
SetbacklFormsl'frenchas (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned:
Building Final (714 7655153)
Last inspection -Final Only After Above Completed
I
Plumbing(GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed.'
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
"p
$
Masonry (Reinf.lBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable Items have been signed:
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mac.)
Grease Interceptor
(Dr, not backfril unless �irmpd off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service