931 E TWILL CTPermit Types
BLD
ELE
MEC
PLM
X
Permit Number: BLD2024-05432
Issued:
www.anaheim. neVbuild ing
(714)765-4626
Quarter Section: 109
0-1 L -4e, G7000-
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 931 E TWILL CT, ANAHEIM, CA 92802
Legal Description: N TR 17920 BLK LOT 1 UN 64 LOT 1 OF TRACT 17920 OF
APN: 93206464
Project Description: Residential EV Charger Level 2
Living Area:
Garage Area:
Carport Area:
Balcony I Deck Area:
Cool Roof:
Number of Stones:
Valuation:
Construction Types:
Ocwpancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:
People Associated with Project:
Contractor A-EV INSTALLS 8536 HAMILTON AVE HUNTINGTON BEACH, CA 92646
Permit Applicant A EV INSTALLS 8536 HAMILTON AVE HUNTINGTON BEACH, CA 92646 0000
5)
0.00
177.00
Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Oty
EV Charger 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PNr,HElM C7<
Cityof Anaheim OF io
Building Division i
U >
• �DVNDED �8h^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
,/g �-`t
C( _-
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 7655041
INSPECTION
DATE I
INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 766.4691
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned :
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/DiaphregmlFrame)
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
backfill off)
(Do not unless s,,ned
Sewer
Water Engineering Backflow (Testable Only)
Water Service