Loading...
931 E TWILL CTPermit Types BLD ELE MEC PLM X Permit Number: BLD2024-05432 Issued: www.anaheim. neVbuild ing (714)765-4626 Quarter Section: 109 0-1 L -4e, G7000- CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 931 E TWILL CT, ANAHEIM, CA 92802 Legal Description: N TR 17920 BLK LOT 1 UN 64 LOT 1 OF TRACT 17920 OF APN: 93206464 Project Description: Residential EV Charger Level 2 Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: Number of Stones: Valuation: Construction Types: Ocwpancy Groups: Fire Sprinklered: Total Fees paid for Permit: People Associated with Project: Contractor A-EV INSTALLS 8536 HAMILTON AVE HUNTINGTON BEACH, CA 92646 Permit Applicant A EV INSTALLS 8536 HAMILTON AVE HUNTINGTON BEACH, CA 92646 0000 5) 0.00 177.00 Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Oty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PNr,HElM C7< Cityof Anaheim OF io Building Division i U > • �DVNDED �8h^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final ,/g �-`t C( _- Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 7655041 INSPECTION DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 766.4691 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned : Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/DiaphregmlFrame) Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor backfill off) (Do not unless s,,ned Sewer Water Engineering Backflow (Testable Only) Water Service