700 W BALL RD (5)mic Types
Eq MEC I PLM
.rmjt Number: BLD2018-00883
Issued: 04/04/2018
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 75
Site Address: 700 W BALL RD
Legal Description: SEC 22 T 4 R 10 POR NW1/4 (LLA
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Disney - TDA - Fall Protection - Tenant Improvement: Installation of new hatch rails and safety gates,
new metal crossover platfroms, new ladder covers and replace the skylight portion of two smoke roof vents at selected areas of
the roof.
Valuation:
$80,000.00
Construcion Types:
IA, ,
Fire Sprinklered?
Yes
Cool Roof
Yes
Total Fees paid for Permit:
1,454.84
People Associated with Project:
Owner WALT DISNEY WORLD CO %WALT DISNEY CO. TAX DEPT P O BOX 4741 GLENDALE CA 91
Engineer CATHERINE A PEPPARD
1729 S DOUGLASS RD F ANAHEIM CA 92806 0000
Permit Applicant STEPHEN MANAMON 1313 S. HARBOR BLVD ANAHEIM CA 92802
Type Electrical Fixtures Qty Type Plumbing Fixtures City Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. mla rem,l combo
PNbNEIM Off`
City of Anaheim O� �O
Building Division F i
>
• �OLNDEC) isft^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE `I
All applicable items below must be signed before utilities are a
Final Gas Test
Electrical Final
Plumbing Final `'"' - -
"
"---
Mechanical Final
Cross Connection Control (714) 765 _ I '
.,V, "'L
i-
Engineering Final (714) 765.5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-50 F -
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beeqinned n
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reiri
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Fling.. Eta Mec & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service