Loading...
236 S ASH STPermit Types BLD ELE MEC PLM X Permit Number: BLD2021.04577 Issued: 10/18/2021 w,ivw.anaheim.net/building (714)765-4626 Quarter Section: 103 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765. 5153 Site Address: 236 S ASH ST Legal Description: N TR 1565 BLK LOT 86 APN: 03722106 Project Description: Reroof: Tear off existing material, resheath as necessary, install 20 squares of composition shingles over house and attached garage. Living Area: Number of Stories: I valuation: 20,000.00 Garage Area', Conseucdon Types: N/A Carrion Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof. Total Fees paid for Period: 341.60 People Associated with Project: Permit Applicant Satapom Boutsady Owner BOUTSADV VIENGKHAM & SATAPORN 236 S ASH ST Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. City of Anaheim P�PHEIM CqC OQ iO Building Division z IV Di \\ OUA'Oeo rah^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSi� All applicable items below must be signed before utilities are raises Final Gas Test -- Electrical Final Plumbing Final - Mechanical Final ���+i i) " ( L Cross Connection Control (714) 765-4 ,' L` �- i ' Engineering Final (714) 765.5126 f -+ i - -" — INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-504 ,— _ Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Lifer Sub ListtBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas "AilpL.,Ngrfbkp I QE D Building Inspections �T�M EX Bate: c 3 �3 Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Rant.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) The permit has expired and/or Floor Nailing (Raised Foundation Only) no final insDection I,, been G",rrlpi9ted. -----These 2nd Floor (Floor Nailing) plans may not reflect "As Guilt" condition£. Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor of (Sheathing/Dia agm/Frame) VasorvirTiTe�InUBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backf 11 unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service