Loading...
609 S OLIVE ST (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-05396 Issued: 10/09/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 84 Site Address: 609 S OLIVE ST, Anaheim, CA 92805 Legal Description: N TR 373 BLK D LOT 11 APN: 25110430 Project Description: Electrical: Ev Charger level 2 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765 - 5153 Living Area: Number of Stories: 0 Valuation: Garage Area Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for permit: 0,00 N/A 177.00 People Associated with Project: Contractor NATION ELECTRIC AND CONSTRUCTION INC 3415 S SEPULVEDA BLVD,STE 1147202106281213255688 LOS ANGELES, CA 90211 Permit Applicant JESUS GONZALEZ Owner HERNANDEZ, ISRAEL 609 S OLIVE Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNPHEIM CqC Cityof Anaheim O� io Building Division 2 p > FOUNDED t8�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 10ANIA Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 7655126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Rail Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler(Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mac.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service