Loading...
831 S BARNETT STPermit Types BLD ELE MEC PLM X Permit Number: BLD2022-03126 Issued: 07/11/2022 www. anaheim. neUbuild i ng (714)765-4626 Quarter Section: 104 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765. 5153 Site Address: 831 S BARNETT ST, ANAHEIM, CA 92806 Legal Description: N TR 3371 BLK LOT 24 APN: 08250413 Project Description: Reroof: Remove existing material, re -sheath as necessary, and install (26) squares over entire house, attached patio, and attached garage. Living Area: Number of Stories: 1 Valuation: 14,200.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area. Fire Sprinklered: cool Roof: Total pass paid for ParmM: 340.85 People Associated with Project: Contractor JOHN DAVID CLARK DBA J D CLARK ROOFIN 15569 ROLLING RIDGE DRIVE199908241216469690 CHINO HILLS, CA 91709 Permm Applicant JOHN D CLARK 15569 ROLLING RIDGE DR CHINO HILLS, CA 91709 0000 Owner LOTERBAUER JENNIFER M 831 S BARNETT ST Type Electrical Fixtures Qty Type Plumbing Fixtures Cry Mechanical Fixtures Oty, The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. �hNEIM �� Cityof Ana h e i m D� �!n0 Building Division f i V ;PERMI �DVNDED �$�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final i ED Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigatlon Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been sinned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) A rk1, 1A. 11r, Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service