703 N MODENA ST (2)Permit Types
BLD
ELE
MEC
PLM
X
Permit Number: BLD2024-04065
Issued: 08106/2024
www.anaheim.net/building
(714)7654626
Quarter Section: 25
Site Address: 703 N MODENA ST, Anaheim, CA 92801
Legal Description: N TR 2296 BLK LOT 67
APN: 07126216
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Seismic Retrofit: Seismic retrofit per FEMA P1100
Living Area:
Garage Area:
CarportArea:
Balcony / Deck Area:
Cool Roof:
Number of Stones:
1 Valuation:
Construction Types:
Occupancy Groups:
Fire Spnnklered:
Total Fees paid for Permit:
People Associated with Project:
Contractor EARTHQUAKE BRACING INCORPORATED 35481RONWEED DR SAN BERNARDINO, CA
Permit Applicant Timothy Sparks
Owner BRISTER, JOAN TR 703 N MODENA ST
6,000.00
N/A
No
408.78
Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures City
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
�ft1EIM �� FINAL INSPECTIONS DATE INSPECTOR
Cityof Anaheim O P ('�O All applicable items below must be signed before utilities are released
Building Division i Final Gas Test
' Electrical Final
Plumbing Final
\�D&NDED thy^ Mechanical Final
Cross Connection Control (714) 765-4280
Do not occupy this building until the final inspections have been made. Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground ElectrodelUfer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Fonns/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned-
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
/ //
111
•�f
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s dried
let Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after apprevah Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service