Loading...
110 W MIDWAY MANORPermit Types BLD ELE MEC I PLM X X Htrq' Permit Number: BLD2019-01896 Issued: 05/16/2019 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 85 Site Address: 110 W MIDWAY MANOR Legal Description: TR 1194 LOT 28 W 57 FT CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Photovoltaic System: Install new residential roof mounted solar system with (9) modules and (1) inverter. Ae Associated with Proje owner JUSL DANIEL BAEZ Contractor SUNRUN INSTALLATION SERVICES INC Type Electrical Fixtures Generators/Transformers - 1 to 10 hp, 1 to 75 kva Valuation: $9,000.00 Construcion Types: N/A, , Total Fees paid for Permit: 730.17 110 W MIDWAY MANOR ANAHEIM CA 92805-4611 20512 CRESCENT BAY #108 LAKE FOREST CA 92630 0000 City Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fold permit combo P�rNEIM �q< City of Anaheim DF !r0 Building Division F 2 ' - �g6MT NDEDtBy^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final - •%`�� .a Mechanical Finales !Cl I Cross Connection Control (714) 7 " '— Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 7 INSPECTION I DATE I INSPECTOR Do not pour concrete until the followne applicable items have been signed Fire Dept. Final (714) 765-504 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Formsrrrenches (Footings) COAIMigation Measures Do not install subfloor or pour Floor slab until the foliwing applicable items have been sioned Building Final (714 7655153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheath inglDiaph ragmlFrame) Masonry (Reinf.lBond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing iOnly after Plbg.. Ele., Mec. & Fire Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service