102 S CONNIE CIRPermit Types
BLD I ELE I MECI FILM
X
Permit Number: BLD2020-04805
Issued: 11 /09/2020
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 133
Site Address: 102 S CONNIE CIR
Legal Description: N TR 7088 LOT 55
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Reroof: Tear off existing material and replace with 3,000 sq. ft. of composition shingles over house and
attached garage.
Valuation: $15,000.00
Construcion Types: NIA, ,
Total Fees paid for Permit: 340.95
People Associated with Project:
Owner CHARLES J GRANO TR 102 S CONNIE CIR ANAHEIM CA 92806-3832
Contractor E & E ROOFING INC 18912 E CENTER AVE ORANGE CA 92869 0000
Permit Applicant EMILIO ESPINOZA AGUILAR E & E ROOFING INC
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. , ;", c.o:i L,
*ar,FtEIM �1`
Cityof Anaheim p4 io
Building Division i
�DGNDED ts�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final -
i'` . 177:
Mechanical Final INSPE
A,
C
71,C)
1,•41
Cross Connection Control (714 `Q ;'
D I r✓
Engineering Final (714) 765-5126
INSPECTION
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 4—.
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-6194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-6153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisVGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg- Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Cniristirtirtinn
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service