Loading...
139 S SIRIUS AVE BPermit Types BLD ELE MEC PLM X X X X Permit Number: BLD2022-02467 Issued: 04/11/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 89 Site Address: 139 W SIRIUS AVE B, ANAHEIM, CA 92802 Legal Description: N TR 3178 BLK LOT 8 APN: 23308425 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765. 5153 N PH F.I - s Project Description: (ADU) New Residential Construction: 1199 sq ft for new detached four -bedroom, three -bathroom accessory dwelling unit with 120 sq ft porch. REF: BLD2023-01685 Living Area: 1199 Number of Stories: Garage Area Carport Area: Balcony I Deck Area. Cool Roof: People Associated with Project: Permit Applicant Michael Kanoyan Owner KANOYAN GRIGOR G Engineer - Civil GEGAM BURNAZYAN 1 Valuation: Construction Types: Occupancy Groups: Fire Sprmiklered: Total Fees paid for Perri 139 W SIRIUS AVE 7918 Foothill Blvd Sunland, CA 91040 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Meter/Disc Sw - Under 600 V, up to 200 3 Bath Tub 1 amps Dishwasher 1 Motors - up to 1 h.p. 1 1 New or total rewire -1 or 2 family 1199 Garbage Disposal Sub Panel/Temp Pwr- Under 600 V, up to 1 Gas System (outlets) 1 200 amps Kitchen Sink 1 Lavatory 3 Sewer per 100 ft. 1 Shower 2 Washing Machine Rough 1 Water Closet 3 Water Heater 1 Water Main per 100 ft. 1 190,000.00 VB R3 No 9,467.42 Mechanical Fixtures City Evaporative Cooler (not portable) 1 Heating Appliances, including vent 1 Residential Registers 8 Ventilation Fan - <= 300 cfm on single duct 4 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�PHEIM �.1` Cityof Anaheim O� iO Building Division F 2 �OVNDED t8h1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Z Electrical Final Q'23 Plumbing Final Mechanical Final p(v^ Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) V&Z J& "FA/ Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) .is COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Sr oned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed 1 Plumbing (Ground/Underfloor Water) 9 g 23 Z G Underfloor Rough Gas $ J S G PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reiff.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) J Rough Duct (Mechanical) 'j4Sry�n� Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele_ Mec. 8 Fire) Insulation (Sound/Energy) �7 'T a , d3 Do not tape or plaster until the following applicable items have been signed: Drywall ov Drywall Penetrations (Ele, Mec & Plbg) Interior Lath F !✓ Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New - Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer 99,13 Water Engineering Backflow (Testable Only) ME Water Service