911 E STANFORD CTPermit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2021.04800
Issued: 02/23/2022
www.anaheim.net/building
(714)765.4626
Quarter Section: 108
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Site Address: 911 E STANFORD CT, ANAHEIM, CA 92805
Legal Description: P BK 150 PG 5 PAR C PM 150-5, FOR. PAR. C.
APN: 08329109
Project Description: Tenant Improvement: 4,417 sq.ft add new restroom, infill two interior door opening to existing warehouse building.
Facade renovation.
Living Area: Number of Stones: 1 Valuation: 55.000.00
Garage Area:
Construction Types: IIIB
Carport Area: Occupancy Groups: Si
Balcony I Deck Area: Fire Sprinklered: yes
Cool Roof: Total Fan paid for Pernik: 3.797.20
People Associated with Project:
Contractor SMITH AND SEVERSON BUILDERS LLC 21072 BAKE PARKWAY SUITE 106201808161427042612 LAKE FOREST, CA 926 00
Permit Applicant Kenneth Bate
Owner JAS PARTNERSHIP 1985 S SANTA CRUZ
Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures City
Conduit and Conductors - per 50 ft. 1 Floor Drain 2 Ventilation Fan - <= 300 cfm on single duct 2
Receptacle, switches, lights 40 Lavatory 2
Repair/Drainage Afteration/Vent Piping
Urinal
Water Closet 2
Water Distribution
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
�t1ElM c
Cityof Anaheim ; "< o
Building Division
ICI �I
\ /
�OVNOEp tah^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
�'
N
Cross Connection Control (714) 765.4
P
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-s ATE
INSPECTION I
DATE
INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Eleetrode/Ufer
Sub ListBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback(Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Laaf Inspection -Final Only After Above comcle;etl
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (ReinfJBOnd Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
hackf 11 off)
(Do net unle dined
Sewer
Water Engineering Backflow (Testable Only)
Water Service