520 W SOUTH STPermit Types
BLD
I ELE
MEC
PLM
X
Permit Number: BLD2021-03072
Issued: 07/12/2021
INSPECTION REQUEST LINE:
(714) 766 - 4626
Quarter Section: 74
Site Address: 520 W SOUTH ST
Legal Description: ORCHARD PARK TR LOT 4 ELY1/2 -EX E
'X�IM t
CITY OF k IEIM
DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Reroof: Tear off existing material and replace with 1,900 sq. ft. of modified bitumen over commercial
building. (ESR-1388)
Valuation: $9,000.00
Construcion Types: WA, .
Total Fees paid for Permit: 341.52
People Associated with Project:
Owner FIRST CHRISTIAN CHURCH 520 W SOUTH ST ANAHEIM CA 92805-4505
Contractor ACCURATE ROOFING COMPANY 7608 SORENSEN AVENUE WHITTIER CA 90606 0000
Permit Applicant JOHN LARA
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. id_per. �.�: aanr
N PH EIM
City of Anaheim /o % "`0
Building Division �I 13
T
DUA'DED 5
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final '
Lf
Mechanical Final S
Cross Connection Control ( 5-
Engineering Final (714) 765.5126
INSPECTION DATE
INSPECTOR
Fire Sprinkler (ONLY) ( 6 - 41
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List(Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
1COAMIgation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765.5153)
Last Inspection -Final Only After Above completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist(Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
7ly jt
.-'V
Masonry (ReinfJBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mee.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service