Loading...
520 W SOUTH STPermit Types BLD I ELE MEC PLM X Permit Number: BLD2021-03072 Issued: 07/12/2021 INSPECTION REQUEST LINE: (714) 766 - 4626 Quarter Section: 74 Site Address: 520 W SOUTH ST Legal Description: ORCHARD PARK TR LOT 4 ELY1/2 -EX E 'X�IM t CITY OF k IEIM DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Reroof: Tear off existing material and replace with 1,900 sq. ft. of modified bitumen over commercial building. (ESR-1388) Valuation: $9,000.00 Construcion Types: WA, . Total Fees paid for Permit: 341.52 People Associated with Project: Owner FIRST CHRISTIAN CHURCH 520 W SOUTH ST ANAHEIM CA 92805-4505 Contractor ACCURATE ROOFING COMPANY 7608 SORENSEN AVENUE WHITTIER CA 90606 0000 Permit Applicant JOHN LARA Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. id_per. �.�: aanr N PH EIM City of Anaheim /o % "`0 Building Division �I 13 T DUA'DED 5 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final ' Lf Mechanical Final S Cross Connection Control ( 5- Engineering Final (714) 765.5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) ( 6 - 41 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List(Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) 1COAMIgation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765.5153) Last Inspection -Final Only After Above completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist(Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) 7ly jt .-'V Masonry (ReinfJBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service