125 W SOUTH ST 101-104 (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024.03720
Issued: 07/19/2024
vnvw.anaheim.net/building
(714)765-4626
Quarter Section: 84
CITY OF ANAHEIM
Ske Address: 125 W SOUTH ST 101-104, Anaheim, CA 92805
Legal Description: N TR 11256 BLK LOT 1 UN HOLD
APN: 25109208
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Project Description: Reroof: Remove and install (24) squares of TPO over building UNITS 101-104
Living Area: Number of Stories: 0 Valuation:
Garage Area: Construction Types:
Carpon Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Pemnit
N P'hi
�P
O/
People Associated with Project:
Contractor ROOFING STANDARDS INC 930 LAWRENCE STABCDE71155192 PLACENTIA, CA 92870
Permit Applicant Isaac Santana
Owner HOLD PARCEL
$6,475.00
N/A
360.21
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qry
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PHEtM cd`
City of Anaheim PNOF iO
Building Division ? i
u a
-
�ONNDED `
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 7654126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4691
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
JCOAJMigation Measures
Do not install subfloor or pour floor slab until the tollwing applicable items have been
sianed.
Building Final (714 765-6153)
Last Inspection -Final Only Aker Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildina Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.lBond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mee. & Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service