Loading...
125 W SOUTH ST 210-218 (2)Permit Types LLD ELE MEC PLM X Permit Number: BLD2024-03722 Issued: 07/19/2024 www.anatheim.net/building (714)765-4626 Quarter Section: 84 CITY OF ANAHEIM Site Address: 125 W SOUTH ST 210-218, Anaheim, CA 92805 Legal Description: N TR 11256 ELK LOT 1 UN HOLD APN: 25109208 BUILDING DIVISION 200 S. ANAHEIM BLVD. 1714) 765 - 5153 Project Description: Reroof: Remove and install (40) squares of TPO over building UNITS 210-218 Living Area: Number of Stones: 0 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony i Deck Area: Fire Sprinklered. Cool Roof: Total Fees paid for Permit: People Associated with Project: Contractor ROOFING STANDARDS INC 930 LAWRENCE STABCDE11155192 PLACENTIA, CA 92870 Permit Applicant Isaac Santana Owner HOLD PARCEL 'X V 36,475.00 NIA 755.48 Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. r,HEIM o Cityof Anaheim D� �`' A� O Building Division _� i D"NDED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 7665153) Last Inspection -Final Only After Above Completed ] Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragm/Frame) ll n7 Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New rnngitniction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor (Do not backfill unless ,,nel off) Sewer Water Engineering Backflow (Testable Only) Water Service