Loading...
150 W VERMONT AVEPermit Types OLD ELE MEC PLM X Permit Number: BLD2022-05672 Issued: 11/30/2022 www.anaheim.net/building (714)765-4626 Quarter Section: 85 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM 4LVD. (714) 765 -5153 Site Address: 150 W VERMONT AVE, ANAHEIM, CA 92805 Legal Description: P BK 38 PG 19 PAR 1 APN: 23417119 Project Description: Reroof: Remove existing to install (102) sq of PVC flat roof Living Area: Number of Stories: 1 Valuation: 210,000.00 Garage Area: Constriction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire SpdnHered: Cool Root Total Fees paid for Permit: 581.80 People Associated with Project: Permit Applicant John Wolf Owner CITY OF ANAHEIM PO BOX 3222 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Qty The permit shall expire by limitation and become null and vold if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PHEIM rqt City of Anaheim 04 W Building Division ' i u > DUNDEO ts�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4260 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4691 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install sllbfloDr or pour floor slab until the follwing applicable items have been srQned Building Final (714765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame)- Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Piny Ele Mec & Frei Insulation (Sound/Energy) Do not tape or plaster until the following applicable fems have been signed Drywall Drywall Penetrations (Ele, Mec & Pfbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-MMeter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backfiow (Testable Only) Water Service