Permit Number: BLD2022-05672
Issued: 11/30/2022
www.anaheim.net/building
(714)765-4626
Quarter Section: 85
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM 4LVD.
(714) 765 -5153
Site Address: 150 W VERMONT AVE, ANAHEIM, CA 92805
Legal Description: P BK 38 PG 19 PAR 1
APN: 23417119
Project Description: Reroof: Remove existing to install (102) sq of PVC flat roof
Living Area: Number of Stories:
1 Valuation: 210,000.00
Garage Area:
Constriction Types: NIA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire SpdnHered:
Cool Root
Total Fees paid for Permit: 581.80
People Associated with Project:
Permit Applicant John Wolf
Owner CITY OF ANAHEIM PO BOX 3222
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and vold if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�PHEIM rqt
City of Anaheim 04 W
Building Division ' i
u >
DUNDEO ts�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4260
Engineering Final (714) 765.5126
INSPECTION
I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-6041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4691
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install sllbfloDr or pour floor slab until the follwing applicable items have been
srQned
Building Final (714765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)-
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after Piny Ele Mec & Frei
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable fems have been signed
Drywall
Drywall Penetrations (Ele, Mec & Pfbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-MMeter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backfiow (Testable Only)