Loading...
510 S SONYA STPermit Types BLD I ELE I MEC 1 FILM X Permit Number: BLD2020-04743 Issued: 12/04/2020 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 54 Site Address: 510 S SONYA ST Legal Description: N TR 9300 LOT 110 _, �X[IMcl,.., CITY OF ANAHEIM Project Description: Residential Remodel: New window opening in the living room. People Associated with Project of 9. _.=r'n ,1nni 200 S. ANAHEIM BLVD. (714) 765 - 5153 Valuation: $2,500.00 Construcion Types: VB, , Total Fees paid for Permit: 206.50 Owner ANTHONY LUCERO 510 S SONIA ST ANAHEIM CA 92802-1339 Contractor SELECT HOME IMPROVEMENTS 1220 FEE ANA ST ANAHEIM CA 92807 Permit Applicant ERON MACIAS Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbld_permit_combo �Nf,HEIM c.'` City of Anaheim OF i0 Building Division h i �OVrYDED tse Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final FP- EZ l 17 7 -. r Mechanical Final 1 i M _L 1 `� Cross Connection Control (714) 765-4�a}r , r CUMEL ETE Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-50 — (� (� Z Do not pour concrete until the following applicable items have been signed* Fire Dept. Final (714) 765-6041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stoned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele_ Mee. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service