210 W SIMMONS AVE (2)Permit Types
BLD ELE MEC PLM
x
Permit Number: BLD2023-02733
Issued: 06/02/2023
www.anaheim. net/building
(714)7654626
Quarter Section: 89
Site Address: 210 W SIMMONS AVE, Anaheim, CA 92802
Legal Description: N TR 2520 BLK LOT 84
APN: 23309416
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
17141 765 - 5153
Project Description: Electrical to replace existing panel to 100 AMP sub panel REF:BLD2022.02170/-04888
Living Area: Number of Stories: 1 Valuation:
Garage Area. ConsWctbn Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinkbred:
Cool Roof: Total Fees pald for Permit:
People Associated with Project:
Permit Applicant Steven Rayne
Owner RAYNA DIANA GUADALUPE a STEVEN 210 W SIMMONS AVE
• t)al i.f .r
0.00
WA
167 00
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Sub Panel/Temp Pwr - Under 600 V. up to 1
200 amps
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
City of Anaheim PNPNEIM CdC
04 iO
Building Division F y
u a
�DVNDED rah^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-6041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed //
/g
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
signedbeen
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after Plbg Ele Me,, & Fire,
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Met & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3 ^
business days after approval) Excludes New y
3/'3
1 r�
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service