Loading...
210 W SIMMONS AVE (3)Permit Types BLD ELE MEC PLM X Permit Number: BL02022-03810 Issued: 08/16/2022 wnvw.anaheim.net/building (714)7654626 Quarter Section: 89 She Address: 210 W SIMMONS AVE, ANAHEIM, CA 92802 Legal Description: N TR 2520 BLK LOT 84 APN: 23309416 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765 - 5153 Project Description: Reroof: Remove existing material, re -sheathe as necessary, and install (12) squares of composition shingles over entire house Living Area: Number of Stories: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Owner Jpal um RAYNA STEVEN 2153 S JETTY DR 10,000.00 N/A 340.30 Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. NPNEIM c� Cityof Anaheim O4P `'O Building Division ti i u > �OVNDEp tay^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714765-5153) Last Inspection -Final Only After Above Completed J, (Q Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Flo F1115of (Sheathing/O' hragm/Frame) ! Masonry (Reinf./Bond Beam/Pre-Grout Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) On not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct, Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service