914 S MANCOS PLPermit Types
BLO ELE MEC PLM
X
Permit Number: BLD2023-03255
Issued: 06/30/2023
vrww.anaheim.net/building
(714)765-4626
Quarter Section: 124
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD,
(714) 765 - 5153
Site Address: 914 S MANGOS PL, ANAHEIM, CA 92806
Legal Description: N TR 4597 BLK LOT 24
APN: 25335318
Project Description: Re -roof tear -off existing and install (35) sq. of composition shingles and OSB on house and attached garage.
Living Area: Number of Stories:
1 Valuation: 30,000.00
Garage Area:
construction Types: NA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered:
Cool Roof:
Total Fees paid for Permit: 364.90
People Associated with Project:
Contractor BREA ROOFING
171 GEMINI AVENUE BREA, CA 92821
Permit Applicant Daniel JustinShirley
171 Gemini Ave Brea, CA 92821
Owner MORA. VICENTE 8 MARIA
914 S MANCOS PL
Type Electrical Fixtures Qty Type
Plumbing Fixtures Qty Mechanical Fixtures oty
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
�/ t�f,FtEIM cq
City of Anaheim OQP C'O
Building DIVISIOn h 1
• �OVNDEO t8�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
n
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
L
P)
/N /
nnn
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing ionly after Ping Ele Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service