Loading...
914 S MANCOS PLPermit Types BLO ELE MEC PLM X Permit Number: BLD2023-03255 Issued: 06/30/2023 vrww.anaheim.net/building (714)765-4626 Quarter Section: 124 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD, (714) 765 - 5153 Site Address: 914 S MANGOS PL, ANAHEIM, CA 92806 Legal Description: N TR 4597 BLK LOT 24 APN: 25335318 Project Description: Re -roof tear -off existing and install (35) sq. of composition shingles and OSB on house and attached garage. Living Area: Number of Stories: 1 Valuation: 30,000.00 Garage Area: construction Types: NA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: 364.90 People Associated with Project: Contractor BREA ROOFING 171 GEMINI AVENUE BREA, CA 92821 Permit Applicant Daniel JustinShirley 171 Gemini Ave Brea, CA 92821 Owner MORA. VICENTE 8 MARIA 914 S MANCOS PL Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures oty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. �/ t�f,FtEIM cq City of Anaheim OQP C'O Building DIVISIOn h 1 • �OVNDEO t8�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been n Building Final (714 765-5153) Last Inspection -Final Only After Above Completed L P) /N / nnn Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing ionly after Ping Ele Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service