825 S MANCOS PL (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BL02023-03883
Issued: 08/01/2023
www.anaheim.neVbu ilding
(714)7654626
Quarter Section: 124
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 6153
Site Address: 825 S MANGOS PL, Anaheim, CA 92806
Legal Description: N TR 5608 BLK LOT 59
APN: 25301207
Project Description: Reroof: To remove and install 25 sq. of comp shingles
over house & attached garage.
Living Area: Number of Stories:
2 Valuation: 7,000.00
Garage Area:
Construction Types: VB
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Spnnklered:
Cool Roof:
Total Fees paid for Permit: 335sl
People Associated with Project:
Contractor SIERRA ROOF INC
P O BOX 3189201202021034570380 ANAHEIM, CA 92803
Permit Applicant Leslie Garcia
P.0 BOX 3189 ANAHEIM, CA 92803
Owner FLORES KRISTV N
825 S MANCOS PL
Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Cry
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
�af,HEIM c.1`
Cityof Anaheim OF iO
Building Division
�OVNDEV 'I
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765.5126
INSPECTION
I DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
sinned
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
�y+
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd FI
of (Sheathing/Dia gm/Frame)
Inf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service