Loading...
711 S GROVE AVEPermit Types BLD ELE MEC PLM X X X X Permit Number: BLD2022-00491 Issued: 02/03/2022 www.anaheirn.net/building (714)7654626 Quarter Section: 104 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765. 5153 Site Address: 711 S GROVE AVE, ANAHEIM, CA 92805 Legal Description: N TR 1696 BLK LOT 3 APN: 08231109 Project Description: Residential Remodel: Install shower with tile, install (6) new lights in the living room, replace (4) ventllabon fans Living Area: Number of Stories: 2 valuation: 5,000.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: No Cool Roof: Total Fees paid for Permit: 394.65 People Associated with Project: Permit Applicant LEON TRAN Owner MILLER JAMES M TR 711 S GROVE AVE Type Electrical Fixtures Oty Type Plumbing Fixtures Q1Y Mechanical Fixtures Oty Receptacle, switches, lights 6 Shower 1 Ventilation Fan - <_ 300 crm on single duct 4 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PNr,NEIM CqC Cityof Anaheim O� io Building Division F Z u 'I / �ooNOED%' Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final TERM yffmD— Mechanical Final INpWET c+ Cross Connection Control (714) 765 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5 Do not pour concre:= a -I -na following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subiloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meier -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Mr, not hnrkf 11 unless s,oned off) Sewer Water Engineering Backflow (Testable Only) Water Service