711 S GROVE AVEPermit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2022-00491
Issued: 02/03/2022
www.anaheirn.net/building
(714)7654626
Quarter Section: 104
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141 765. 5153
Site Address: 711 S GROVE AVE, ANAHEIM, CA 92805
Legal Description: N TR 1696 BLK LOT 3
APN: 08231109
Project Description: Residential Remodel: Install shower with tile, install (6) new lights in the living room, replace (4) ventllabon fans
Living Area: Number of Stories:
2 valuation:
5,000.00
Garage Area:
Construction Types:
NIA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered:
No
Cool Roof:
Total Fees paid for Permit:
394.65
People Associated with Project:
Permit Applicant LEON TRAN
Owner MILLER JAMES M TR 711 S GROVE AVE
Type Electrical Fixtures Oty Type Plumbing Fixtures
Q1Y Mechanical Fixtures
Oty
Receptacle, switches, lights 6 Shower
1 Ventilation Fan - <_ 300 crm on single duct
4
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PNr,NEIM CqC
Cityof Anaheim O� io
Building Division F Z
u 'I
/
�ooNOED%'
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final TERM
yffmD—
Mechanical Final
INpWET
c+
Cross Connection Control (714) 765
Engineering Final (714) 765-5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5
Do not pour concre:= a -I -na following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subiloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meier -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Mr, not hnrkf 11 unless s,oned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service