Loading...
206 E WAKEFIELD AVE C-D (2)Permit Types BLD ELE MEC :EM:] X Permit Number: BLD2024-01545 Issued: 05/08/2024 www.anaheim.net/building (714)7654626 Quarter Section: 98 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765. 5153 Site Address: 206 E WAKEFIELD AVE C-D, Anaheim, CA 92802 Legal Description: N TR 3535 BLK LOT 13 APN: 13733501 Project Description: Residential Remodel: Remove guardrails at second floor deck and replace sliding door with window (unit C), remove second floor deck and replace sliding door with window (unit D). Living Area: Number of Stones: 2 Valuation: 3,000.00 Garage Area'. construction Types: VB Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered'. Cool Roof: Total Fees paid for Permit: 1,219.84 People Associated with Project: Permit Applicant Daniel Otteson Owner EVANS, JOHN V TR EVANS 2305 HILL LN Contractor FRC RESTORATION INC DBA FREEDOM REST 25520 PALERMO WAY YORBA LINDA, CA 92887 Engineer - Civil AYMAN SHMEIT 97"MAPLE ST STE#101 BELLFLOWER, CA 90706 Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. NPHEIM �' Cityof Anaheim OF P �v\ Building Division ' U �OVNDED tali^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwmg applicable items have beensioned - Building Final (714 765-5153) Last Inspection -Final Only After Above Completed \ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) Eq 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele_ Mec & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Flog) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backf 11 unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service