Permit Number: BLD2021-01103
Issued: 11/10/2021
www.anaheim.net/building
(714)765-4626
Quarter Section: 196
Site Address: 168 S FAIRMONT BLVD
Legal Description: P BK 207 PG 41 PAR 1
APN:36643117
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765. 5153
Project Description: Change of Use: 1,500 sq ft to convert existing office space into bakery with new kitchen equipment and ADA
bathroom renovations
Livirg Area:
Number of Stories: 1 Valuation:
Garage Area:
construction Types:
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnkiered.
Cool Roof:
Total Fees paid for Parma:
People Associated with Project
50,000.00
VB
B, B.B
Yes
7.693.73
Contractor
CALIFORNIA BUILDERS REMODELING &
18700 BEACH BLVD SUITE 150 HUNTINGTON BEACH, CA
Permit Applicant
Dale Morales
Owner
FAIRMONT REMARC LLC
23201 LAKE CENTER DR #207 LAKE FOREST, CA 92630
Engineer - Electrical
TUAN A VU
15141 WOODLAWN AVE201407241059353830 TUSTIN, CA 92780
ArchitectlEngineer
GARY MAXWELL
2175 PACIFIC AVE #C42D0009270953065400 COSTA MESA, CA 92627
Architect(Engineer
MAJID JAZAYERI
2111 BUSINESS CENTER DR20031l l41008505860 IRVINE. CA
Type Electrical Fixtures Qry Type Plumbing Fixtures
Qry
Mechanical Fixtures
Qty
Receptacle, switches, lights 60 Backtlow Exterior - 2 inch or less
i
Commercial Hoods (including ducts)
1
Floor Drain
1
Ventilation Fan - <= 300 cfm on single duct
12
Floor Sink
1
Ventilation Fan -> 300 cfm on single duct
2
Garbage Disposal
1
Gas System (outlets)
1
Kitchen Sink
1
Lavatory
2
Repair/Drainage Alteration/Vent Piping
1
Service, Mop, Slop Sink
1
Sewer per 100 ft.
2
Water Closet
1
Water Distribution
1
Water Healer
1
Water Softener
1
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
P�PHEIM Oq<
Cityof Anaheim D� t
Building Division _� i
>
t
not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing FinalVNDED
Mechanical Final
Cross Connection Control (714) 765-428Do
&�npu
Engineering Final (714) 765-5126
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have beenrsigned:
Fire Dept. Final (714) 765-5041Plumbing
(Ground/Underfloor Drain Waste)
frt
JSC
Water Engineering (714) 765-4591Electrical
Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow
Setback/Forms/Trenches (Footings)
COA/Mlgation Measures <, T CCly
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765.5153) �
Last lnspection-Final Only After Abo r,,yJy TtLR
Plumbing (Ground/Underfloor Water)
J S
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf-)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Disphragm/Frame)
Masonry (Refnf.Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
$C
Rough Duct (Mechanical)
1�
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only attar Plbg., Ele., Mec. &Fire)
I G a �
JSG
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
la �xI ROuGN fo-,A f-� OAIL-Y — JSG
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
2
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service