Loading...
542 S EVENINGSONG CTPeril Types BLD ELE MEC PLM X X Permit Number: BLD2021-03448 Issued: 10/08/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 226 Site Address: 542 S EVENINGSONG CT Legal Description: N TR 12989 LOT 31 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Remodel: Remove existing door and window and replace with 10 sq ft sliding door in family room. Valuation: $11,000.00 Construcion Types: VB, Total Fees paid for Perh: 494.43 People Associated with Project Owner THOMAS J II MC CHURCH 542 EVENINGSONG CT ANAHEIM CA 92808-1640 Engineer LEO P BURKE 31351 AGUACATE ROAD SAN JUAN CAPISTRANO CA 92675 Contractor SKYE WALLS BY WESTERN 1355 S STATE COLLEGE BLVD ANAHEIM CA 92806 Permit Applicant SAMUEL CORDOSI Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Receptacle, switches, lights 2 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. ��PNEIM cq` Cityof Anaheim OF io Building Division F z > �OVNDED tb; Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final XP RED Plumbing Final Mechanical Final G HT G Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7653 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 766-4691 Electrical Ground Electrode/Ufer Sub List/Bus, Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches ootings I 24 COAIMigation Measures Do not install subiloor or pour until the follwing applica a items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been soned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd FlooLA4@kr Roof ( n Diaphragm/Frame) y Mason Inf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mee. & Fire) 1 2y 2 A 1-4 Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall 24 jkM Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) P 9 29. I l �` T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not h,,.kfill unless Sewer Water Engineering Backflow (Testable Only) Water Service