Loading...
223 E DEL GIORGIO RDPermit Types BLD ELE 1 MEC 1 PLM X Permit Number: BLD2022-03071 Issued: 07/07/2022 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 4714) 765 •5153 www.anaheim.net/building (714)765-4626 Quarter Section: 202 Site Address: 223 S DEL GIORGIO RD, ANAHEIM, CA 92808 Legal Description: S TWP 4 RGE 8 SEC 6 SEC 6 T 4 R 8 POR OF SEC APN: 35632213 Project Description: Retaining Wall: (2) retaining walls (1) 20 In 7t at with max height of Eft (1) 15 In ft with max height of Eft Living Area: Number of Stories: 0 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklored: Cool Roof: Tout Fees, paid for Permit: People Associated with Project: Contractor D/C CONSTRUCTION P O BOX 3190200406141232462010 FULLERTON, CA 92831 Permit Applicant Grahame Taylor Owner MCGRAIL JONATHAN 223 S DEL GIORGIO RD 3,000.00 N/A No 381.50 Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 366 days from the date of permit Issuance. A new permit Is required to commence or continue work. ��r,He1M �'` City of Anaheim o4 io Building Division f i wNOEp �gy^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final PERi'MIT WX21 - Plumbing Final Mechanical Final Cross Connection Control (714) 7 6 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 76ui&ll L. Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Formsrrrenches (Footings) //2 -2. L k COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sigilgol Building Final (714 765-5153) Last Inspection -Final Only Aker Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections 7JB12 , s��_— Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) 1 ,— Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg Ele - Mec & Fire) Insulation (Sound/Energy) Do not tape or plaster wild the fpllnwmg applicahle items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service