Loading...
580 S GOLDEN SKY LNPermit Types BLD ELE MEC PLM X XI I X Permit Number: BLD2022.01439 Issued: 04/04/2022 www.anaheim. net/bu i Iding (714)7654626 Quarter Section: 192 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 580 S GOLDEN SKY LN, ANAHEIM, CA 92807 Legal Description: N TR 10032 BLK LOT 19 APN: 36333113 Project Description: Residential Remodel: Remodel at bathroom to convert bathtub shower with acrylic walls. With plumbing and electrical. Living Area: Number of Stories: 0 Valuation: 5,500.00 Garage Area: Consauclion Types: NIA Carport Area: Occupancy Groups: 6alwny / Deck Area: Fire Spnnklered: Cod Root: Total Fees paid for Parma: 215.72 People Associated with Project: Contractor REBORN CABINETS DBA REBORN BATH SOL 5515 E LA PALMA AVE SUITE 250 ANAHEIM, CA 92807 Permit Applicant Emily Baaolf 800 Hopper Ave. Santa Rosa, CA 95403 Owner KIPP NEDRA TR 580 S GOLDEN SKY LN Type Electrical Fixtures City Type Plumbing Fixtures Cry Mechanical Fhdures City Receptacle, switches, lights 1 Shower 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. cqI City of Anaheim N04EIM w Building Division 2 Iv� �al r -i FOVNO Ev �s5^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed* Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) r. Water Engineering (714) 765-4591 I I y S P Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 ( s - Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) DATE. Last Inspection -Final Only After Above Completed ' Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or oneea! the work below until the following applicable Items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAtMitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service