Permit Number: BLD2022.01439
Issued: 04/04/2022
www.anaheim. net/bu i Iding
(714)7654626
Quarter Section: 192
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 580 S GOLDEN SKY LN, ANAHEIM, CA 92807
Legal Description: N TR 10032 BLK LOT 19
APN: 36333113
Project Description: Residential Remodel: Remodel at bathroom to convert bathtub shower with acrylic walls. With plumbing and
electrical.
Living Area: Number of Stories:
0 Valuation: 5,500.00
Garage Area:
Consauclion Types: NIA
Carport Area:
Occupancy Groups:
6alwny / Deck Area:
Fire Spnnklered:
Cod Root:
Total Fees paid for Parma: 215.72
People Associated with Project:
Contractor REBORN CABINETS DBA REBORN BATH SOL 5515 E LA PALMA AVE SUITE 250 ANAHEIM, CA 92807
Permit Applicant Emily Baaolf
800 Hopper Ave. Santa Rosa, CA 95403
Owner KIPP NEDRA TR
580 S GOLDEN SKY LN
Type Electrical Fixtures City Type
Plumbing Fixtures Cry Mechanical Fhdures City
Receptacle, switches, lights 1 Shower
1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
cqI
City of Anaheim N04EIM w
Building Division 2
Iv� �al
r
-i
FOVNO Ev �s5^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
I DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed*
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
r.
Water Engineering (714) 765-4591 I I y S P
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (
s -
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153) DATE.
Last Inspection -Final Only After Above Completed
'
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or oneea! the work below until the following applicable Items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAtMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)