990 S HEDIN CIRPermit Types
BLD ELE MEC I FILM
X
Permit Number: BLD2021-03845
Issued: 10/13/2021
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 217
Site Address: 990 S HEDIN CIR
Legal Description: N TR 8075 LOT 64
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: Enlarge existing patio door opening to install new bi-fold door and header
Valuation: $19,300.00
Construcion Types: VB, ,
Fire Sprinklered? No
Total Fees paid for Permit: 876.01
People Associated with Project
Owner JUSIN AND CERA HURTADO 990 S HEDIN CIR ANAHEIM CA 92807-4512
Permit Applicant RIDGE BRIEL
Contractor WINDOW DESIGN GROUP 1336 MOOREPARK RD #226 THOUSAND OAKS CA 91360 0000
Engineer SAEID MOHAMMAD]
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fNo oetmu combo
�hNEtM Cq
Cityof Anaheim Dt P CEO
Building Division F z
�OVAIDED t$ft^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final PERMl!IRED
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765 P
Engineering Final (714) 765.5126
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5 ATE:
Tf
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdere)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been soned
1st Floor Shear
Firesprinkler(Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless s,nnpd off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service