Loading...
990 S HEDIN CIRPermit Types BLD ELE MEC I FILM X Permit Number: BLD2021-03845 Issued: 10/13/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 217 Site Address: 990 S HEDIN CIR Legal Description: N TR 8075 LOT 64 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Remodel: Enlarge existing patio door opening to install new bi-fold door and header Valuation: $19,300.00 Construcion Types: VB, , Fire Sprinklered? No Total Fees paid for Permit: 876.01 People Associated with Project Owner JUSIN AND CERA HURTADO 990 S HEDIN CIR ANAHEIM CA 92807-4512 Permit Applicant RIDGE BRIEL Contractor WINDOW DESIGN GROUP 1336 MOOREPARK RD #226 THOUSAND OAKS CA 91360 0000 Engineer SAEID MOHAMMAD] Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fNo oetmu combo �hNEtM Cq Cityof Anaheim Dt P CEO Building Division F z �OVAIDED t$ft^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final PERMl!IRED Plumbing Final Mechanical Final Cross Connection Control (714) 765 P Engineering Final (714) 765.5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765.5 ATE: Tf Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girdere) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been soned 1st Floor Shear Firesprinkler(Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless s,nnpd off) Sewer Water Engineering Backflow (Testable Only) Water Service