Loading...
240 S LEANDRO STPermit Types BLD ELE MEC PLM X X Permit Number: 131.132022.00891 Issued: 03/15/2022 www.anaheim.net/bu ilding (714)7654626 Quarter Section: 191 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 240 S LEANDRO ST, ANAHEIM, CA 92807 Legal Description: N TR 7003 BILK LOT 27 APN: 36313127 Project Description: Photovoltaic: Install residential roof mounted solar with (44) modules, (44) micro -inverters, a 125 amp subpanel and a 225 amp main service. Living Area: Number of Stories: 0 Valuations. 35.000o(l Garage Area: Construction Types: VA Carport Area. Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fes. and for Parent: 844.55 People Associated with Project: Contractor MARC JONES CONSTRUCTION LLC DBA SUN 128 NORTHPARK BLVD,ATT: LEGAL COVINTON, LA 92595 Permit Applicant Enca Heron Owner RIVERA FELIPE 8 DANIELA 240 S LEANDRO ST Type Electrical Fixtures Cry Type Plumbing Fixtures Qty Meter/Disc Sw - Under 600 V, over 200 1 amps to 500 amps Microinverter 44 Sub Panel/remp Pwr - Under 600 V, up to 1 200 amps Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PNpHEtM cqC City of Anaheim °� io Building Division 1'� i > °UA,DED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765.59AE Do not pour concrete until the following applicable items have been s.,ne. . Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) 1COAlMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1 st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mee. & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -{Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct, Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service