225 S MARTINEZ RDPermit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD2021-00900
Issued: 09/14/2021
www.anaheim.net/building
(714)7654626
Quarter Section: 202
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 225 S MARTINEZ RD, ANAHEIM, CA 92808
Legal Description: TR 117 LOT 10 FOR OF LOT (P M 58-28
APN: 35631107
Project Description: Photovoltaic System: Remove existing roofing material and install 2,200 sq. ft. of new residential roof tile solar
system with (176) modules, (1) inverter, (1) battery backup, and (1)
200 amp load center
Living Area: Number of Stones:
2 Valuation:
40,000.00
Garage Area:
Construction Types:
Not Applicable
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
No
Cool Roof:
Total Fees paid for Permit:
1,44670
People Associated with Project:
Contractor TESLA ENERGY OPERATIONS INC
901 PAGE AVE200809171020478510 FREMONT, CA 92606
Permit Applicant ADELA MELENDREZ
Permit Applicant SAM STABLEIN
Owner MICHAEL RACKE
225 MARTINEZ ST ANAHEIM, CA 92808
Type Electrical Fixtures Oty Type
Plumbing Fixtures Oty Mechanical Fixtures
City
Generators/Transformers - up to 1 hp, up 2
to 1 kva
Sub Panel/Temp Pwr - Under 600 V, up to 1
200 amps
The parmit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PH IE M C�9
Cityof Anaheim 0F/
Building Division
u Ia.
�OVNp Eo ta`'^'
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
if
Cross Connection Control (714) 765-42
fON
Engineering Final (714) 765-5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete .;ntI the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sitared
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. & Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
� Do not backfill unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service