Loading...
711 S PROVENTIAL DRsz> Permit Types BLD ELE IMEG PLM 1c`'�t"'!rS X Permit Number: BLD2020-04819 Issued:11/09/2020 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 74 Site Address: 711 W PROVENTIAL DR Legal Description: N TR 3492 LOT 5 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Reroof: remove and install (1,400) square footage of composition shingles onto property. Valuation: Construcion Types: Total Fees paid for Permit; $14,000.00 N/A. . 341.82 People Associated with Project: Owner ROBERT G ANDERSON 1804 CALLE LETICIA SAN CLEMENTE CA 92672-2301 Permit Applicant ROBERT E ANDERSON Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim O� oaf NEIM Co Building Division F S > �0 NDEO �8h^ Do not occupy this building until the final inspections have been made. FINAL SPECTION l INSPECTOR All applicable i emsNbelow must ne signed before utiil ties are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been -sianed Building Final (714 765-5153) i Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections lllz-�Id — t�c,�rolL�,t DIC- 1C FL4..T $[tt�KL�c Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) L Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service