711 S PROVENTIAL DRsz>
Permit Types
BLD ELE IMEG PLM 1c`'�t"'!rS
X
Permit Number: BLD2020-04819
Issued:11/09/2020
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 74
Site Address: 711 W PROVENTIAL DR
Legal Description: N TR 3492 LOT 5
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Reroof: remove and install (1,400) square footage of composition shingles onto property.
Valuation:
Construcion Types:
Total Fees paid for Permit;
$14,000.00
N/A. .
341.82
People Associated with Project:
Owner ROBERT G ANDERSON 1804 CALLE LETICIA SAN CLEMENTE CA 92672-2301
Permit Applicant ROBERT E ANDERSON
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures City
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
City of Anaheim O� oaf NEIM Co
Building Division F S
>
�0 NDEO �8h^
Do not occupy this building until the final inspections have been made.
FINAL
SPECTION
l
INSPECTOR
All applicable i emsNbelow must ne signed before utiil ties are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
-sianed
Building Final (714 765-5153) i
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
lllz-�Id — t�c,�rolL�,t DIC- 1C FL4..T $[tt�KL�c
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisVGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
L
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service