848 S STATE COLLEGE BLVDPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2022-02473
Issued: 06/03/2022
www.anaheim.net/building
(714)765-0626
Quarter Section: 114
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Site Address: 848 S STATE COLLEGE BLVD, ANAHEIM, CA 92806
Legal Description: N TR 2350 BLK LOT 77
APN: 25303312
Project Description: Reroof: Remove existing material, resheath as necessary and install (33) squares of composition shingles for the
house and garage.
Living Area: Number of Stories:
1 Valuation: 16,200.00
Garage Area:
Construction Types: WA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered:
Cool Roof:
Total Fass paid for Permit: 363, 11
People Associated with Project:
Contractor ONE STOP ROOFING
27702 CROWN VALLEY PKWY,SUITE D4-254 SUITE D4-254 201811301119423159 LADERF
Permit Applicant Madbel Lopez
Owner SKROMEDA COLIN
848 5 STATE COLLEGE BLVD
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PNp "EIM C1`
City of Anaheim of io
Building Division F i
u S
�DVNDED �a�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install sumloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
M-
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Rail
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
y
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele., Mee. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed'
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service