Loading...
100 S STATE COLLEGE BLVDPermit Types BLD ELE MEC PLM X I X Permit Number: BLD2019-01854 Issued:07/09/2019 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 112 Site Address: 100 S STATE COLLEGE BLVD Legal Description: CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Miscellaneous: (5) new light poles, restripe parking. REF: BLD2019-01852 Valuation: $1,000.00 Construcion Types: VB, Occupancy Groups: Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 325.50 People Associated with Project Owner WILLIAM REGO TR 9330 BALBOA AVE SAN DIEGO CA 92123-1516 Engineer MARK A KAISER 12001 N CENTRAL EXPRESSWAY STE 300 DALLAS TX 75243 Engineer DENNIS HEATH 1115 ATLANTIC AVE. ALAMEDA CA 94501 Engineer WILLIAM D BEST 5880 SAWMILL RD STE200 DUBLIN OH 43017 Engineer ROBERT L KOEPER 5880 SAWMILL RD STE 200 DUBLIN OH 43017 Contractor T MORRISSEY CORPORATION 3740 OCEANIC WAY SUITE 301 OCEANSIDE CA 92056 0000 Permit Applicant ERIC RAMOS 3740 OCEANIC WAY STE 301 OCEANSIDE CA 92056 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Pole Light (with one fixture) 5 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. L...., ,,._.. ��pHEtM ��` City of Anaheim O4 io Building DIVISIOn F i u i ,OVNOED 1157 Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final PERMIT EXPIRE-74P Plumbing Final Mechanical Final Cross Connection Control (714) 76 Engineering Final (714) 7655126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765- E: I bill Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub Llst/Bus. Lic. (714) 7654194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Mlgatlon Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 7655153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGlyders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned 1st Floor Shear Flresprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagatlon Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signs Drywall Drywall Penetrations (Ele, Mec & Pibg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service