Loading...
261 S ORANGE ACRES RD (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-02951 Issued: 06/10/2024 www.anahaim.net/building (714)765-4626 Quarter Section: 168 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765 -5153 Site Address: 261 S ORANGE ACRES RD, ANAHEIM, CA 92807 Legal Description: N TR 59 BILK LOT 27 TR 59 LOT 27 1.18 AC LOT IN LOT APN: 36119107 Project Description: Reroof: Partial reroof, remove and install (18 ) sq of flat roof over middle portion of the property Living Area: Number of Stories: t valuation'. Garage Area: Construction Types: Carport Area: Dcwpamy Groups: Balcony / Deck Area: Fire Spdnklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Permit Applicant Rakesh Bhola Owner BHOLA, RAKESH K TR BHOLA 261 ORANGE ACRES OR PMEIM �. O wr+■ '.. > b 6.000.00 N/A 350.78 Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A now permit is required to commence or continue work. NPHEi,yt Cq Cityof Anaheim �D Building Division ,2 �I' r \��pi,'1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been -sianed Building Final (714 765-5153) Last Inspection -Final Only After Above Completed t Lit !fit Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -stab (Compaction/Membrane Remi Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned let Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed'. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-a business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor fDo not backfill unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service