261 S ORANGE ACRES RD (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-02951
Issued: 06/10/2024
www.anahaim.net/building
(714)765-4626
Quarter Section: 168
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765 -5153
Site Address: 261 S ORANGE ACRES RD, ANAHEIM, CA 92807
Legal Description: N TR 59 BILK LOT 27 TR 59 LOT 27 1.18 AC LOT IN LOT
APN: 36119107
Project Description: Reroof: Partial reroof, remove and install (18 ) sq of flat roof over middle portion of the property
Living Area: Number of Stories: t valuation'.
Garage Area: Construction Types:
Carport Area: Dcwpamy Groups:
Balcony / Deck Area: Fire Spdnklered:
Cool Roof: Total Fees paid for Permit:
People Associated with Project:
Permit Applicant Rakesh Bhola
Owner BHOLA, RAKESH K TR BHOLA 261 ORANGE ACRES OR
PMEIM �.
O
wr+■ '.. >
b
6.000.00
N/A
350.78
Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures City
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A now permit is required to commence or continue work.
NPHEi,yt Cq
Cityof Anaheim �D
Building Division ,2
�I' r
\��pi,'1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
-sianed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
t
Lit
!fit
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -stab (Compaction/Membrane Remi
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
let Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed'.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-a
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
fDo not backfill unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service